JACOBSEN FAIRWAY 305 Series CG2
SAFETY AND OPERATION & MAINTENANCE MANUAL
en-21
7.1
DAILY INSPECTION
1.
Perform a visual inspection of the entire unit, look for signs of wear, loose hardware and missing or
damaged components. Check for fuel and oil leaks to ensure connections are tight and hoses and
tubes are in good condition.
2.
Check the fuel supply, radiator coolant level, crankcase oil level and air cleaner is clean. All fluids
must be at the full mark with the engine cold.
3.
Make sure all cutting units are adjusted to the same height of cut.
4.
Check all tyres for proper inflation.
5.
Test the operator presence and safety interlock system.
CAUTION
The daily inspection should be performed only
when the engine is off and all fluids are cold.
Lower implements to the ground, engage
parking brake, stop engine and remove ignition
key.
7
OPERATION
Содержание Fairway 305 Turbo
Страница 31: ...JACOBSEN FAIRWAY 305 Series CG2 SAFETY AND OPERATION MAINTENANCE MANUAL en 29 7 OPERATION...
Страница 49: ...JACOBSEN FAIRWAY 305 Series CG2 SAFETY AND OPERATION MAINTENANCE MANUAL en 47 9 ADJUTMENTS...
Страница 70: ...JACOBSEN FAIRWAY 305 Series CG2 SAFETY AND OPERATION MAINTENANCE MANUAL en 68 NOTES...
Страница 72: ......
Страница 101: ...JACOBSEN FAIRWAY 305 Serija CG2 PRIRO NIK ZA VARNOST UPRAVLJANJE IN VZDR EVANJE sl 29 7 UPRAVLJANJE KOSILNICE...
Страница 132: ...JACOBSEN FAIRWAY 305 Serija CG2 PRIRO NIK ZA VARNOST UPRAVLJANJE IN VZDR EVANJE sl 60 11 1 HIDRAVLI NI SISTEM 11 SHEME...
Страница 140: ...JACOBSEN FAIRWAY 305 Serija CG2 PRIRO NIK ZA VARNOST UPRAVLJANJE IN VZDR EVANJE sl 68 OPOMBE...
Страница 142: ......
Страница 143: ......