ELECTRICAL POWER CONNECTION:
Electrical and grounding connections must comply with the applicable portions of the
National Electrical Code ANSI/NFPA 70 (latest edition) and/or other electrical codes.
Disconnect electrical power supply and place a tag at the disconnect switch to indicate that you are working on the circuit.
The dishmachine data plate is located on the right side and to the front of the machine. Refer to the data plate for machine oper-
ating requirements, machine voltage, total amperage load and serial number.
To install the incoming power lines, open the control box. This will require taking
a phillips head screwdriver and removing the four (4) screws on the front cover of
the control box. Install 3/4” conduit into the pre-punched holes in the back of the
control box. Route power wires and connect to power block and grounding lug.
Install the service wires (L1, L2, & L3 (three phase only)) to the appropriate ter-
minals as they are marked on the terminal block. Install the grounding wire into
the lug provided. Tighten the connections. It is recommended that “DE-OX” or
another similar anti-oxidation agent be used on all power connections.
VOLTAGE CHECK:
Ensure that the power switch is in the OFF position and apply
power to the dishmachine. Check the incoming power at the terminal block and
ensure it corresponds to the voltage listed on the data plate. If not, contact a qual-
ified service agency to examine the problem. Do not run the dishmachine if the
voltage is too high or too low. Shut off the service breaker and mark it as being
for the dishmachine. Advise all proper personnel of any problems and of the loca-
tion of the service breaker. Replace the control box cover and tighten down the
screws.
Tempstar HH Series Technical Manual 7610-002-23-32
Issued: 09/14/2007 Revised: N/A
SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
ELECTRICAL INSTRUCTIONS
9
Power Block
Ground Lug
Incoming Power Connection
Содержание TempStar HH
Страница 8: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Страница 14: ...7 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Страница 20: ...13 SECTION 3 PREVENTATIVE MAINTENANCE ...
Страница 22: ...15 SECTION 4 TROUBLESHOOTING ...
Страница 25: ...18 SECTION 5 PARTS SECTION ...
Страница 54: ...47 SECTION 6 ELECTRICAL SCHEMATICS ...
Страница 68: ...61 SECTION 7 JACKSON MAINTENANCE REPAIR CENTERS ...
Страница 75: ......