七
、缝纫机调整
Sewing machine adjustment
注意:为了防止机器突然启动造成人身事故,请关掉电源,确认电机确实停止转动
后再进行操作
Attention
:
In order to prevent the sudden start of the machine which causing a personal
accident, please turn off the power, make sure the motor does stop rotating before
operating!
1、冷却器导线器的调整
松开紧定螺钉,把各导线杆高度调整为图示的尺寸,然后拧紧紧定螺钉(图7-1),
针对不同布料时可通过调节A、B、C的高度来调节挑线量,导线杆的高度增加挑线
量减小,导线杆的高度降低挑线量增加(图1)。
1
、
Cooler
wire
guide adjustment.
Adjust the release needle thread guide hight to the number below
,
then tightening screw
(
Figure7-1
),
Accounting to different fabric, we can change thread taking up length by
adjusting needle thread guide hight A
、
B
、
C
,
Thread taking up quantity increase when
needle thread guide hight decrease and thread taking up quantity decrease when needle
thread guide hight increase.
(
Figure 1
)。
A
B
C
12
21
32
Содержание K4-D Series
Страница 1: ...K4 D K4 D series use manual...
Страница 26: ...8 4 5...