Unpack and Connect the Unit
1.
Unpack the unit from the shipping container, and verify that you have all the required components.
The PerfectStorm ONE shipping carton contains the following items:
l
One PerfectStorm ONE appliance
l
One rack mounting kit
l
One power cord
l
One RJ45 to DB232 cable
l
Ixia standard warranty notice
l
One
PerfectStorm ONE Getting Start Guide
l
Any optional items that you ordered (such as transceivers and cables)
If any items are missing or damaged, contact Ixia Support. Refer to
Ixia Technical Support Contacts on page 68
for contact information
for each Ixia region.
2.
Place the unit in the operating location that you have chosen.
You can operate the appliance as a desktop unit or a rack-mounted chassis. For rack-mount instructions, refer to
3.
Before connecting the unit, record the following information from the label on the back of the unit:
l
Host Name (for example, PS40G-X1234567),
l
Part number (for example, 941-0028),
(You can record these on the form
.)
4.
Connect the LAN port on the PerfectStorm ONE to your network.
11 | Physical Setup
Содержание PerfectStorm ONE
Страница 1: ...PerfectStorm ONE Getting Started Guide ...
Страница 21: ...The assembly is now complete and the appliance is ready to install into the rack 21 Physical Setup ...
Страница 22: ...4 Insert the other screws and secure the appliance to the rack by tightening the screws Physical Setup 22 ...
Страница 23: ...23 ...
Страница 27: ...27 ...
Страница 71: ...V virtual machines 25 71 ...