
22
4. Installation and Initial Start-Up
Press the
[Next]
button to confirm the self-test.
Before the first firing, the firing chamber should be dehumidified using the dehumidification program (see Chapter
5.4 for details).
Please note that the furnace may require a certain acclimation time after having been set-up. Particularly if the
furnace was exposed to considerable temperature changes (water condensation).
Содержание Programat EP 5010
Страница 1: ...1 Programat EP5010 Operating Instructions Valid from software V5 0...
Страница 2: ...2...