Page 9
Installation
NEW EcoHeater
MEH.210501.01.EN
Continuous product development may give rise to specification changes without notice.
1. Slide stop with sticker
2. Wing screw
3. Lifting bracket with sticker
3.1 Lifting of unit with bracket EMMT-08
• Lifting brackets EMMT-08 (accessories) are placed in the lower four corners
of the unit and are slid into the existing horizontal groove in the aluminium
section.
• The slide stop is pushed into the vertical groove in the aluminium bar and
locked with the wing screw in the lifting bracket.
• The slide stop must be mounted in the lifting bracket before lifting the unit.
• The bracket must be mounted with the lifting lug up, not down or to the side.
• The equipment must be handled with care both during installation and
storage.
• If the bracket binds when mounting, do not use it.
• Maximum weight per bracket: 400 kg. Maximum weight, unit with 4
brackets: 1600 kg.
• Visual inspection must be carried out on the bracket before use. There may
be no cracks or deformations. Rivets must not be rusty or damaged.
• A spreader bar must be used. See "3.4 Spreader bar" page 11.
1
2
3
Содержание EcoHeater
Страница 1: ...Installation NEW EcoHeater English ...
Страница 29: ......
Страница 30: ......
Страница 31: ......