Page 12
Installation
NEW EcoHeater
MEH.210501.01.EN
Continuous product development may give rise to specification changes without notice.
4 Unit placement
The unit is installed on a flat, vibration-dampened, horizontal surface.
The example above shows a "floating floor", which provides good vibration
dampening. On a floating floor, a waterproof trough with water runoff should be
constructed for drainage of condensation water.
1 Joists, when installed above noise-sensitive environments, additional
measures must be taken.
2 Joist insulation
3 Flooring panel
4 Drainage/water run-off
5 Mineral wool 100 mm
6 Particleboard 22 mm or equivalent
7 Watertight trough with water run-off
Min. 300 mm
OUT
IN
Min. 300 mm
5
3
4
1
2
6
7