7
Chargemaster Pinner Superbar
5101167 Rev. F
NOTE –
Do not exceed the 5.0 mA current capacity of the power supply.
NOTE –
Do not install bars face-to-face less than 3” apart.
NOTE –
Do not operate bars continuously for more than twenty minutes when
equipment is not operating. A photoelectric sensor with a signal OFF delay timer
should be used to disable the power supply when no product is traveling between
the bars. Energize the bar when the photoelectric sensor senses product flow.
Position the sensor upstream of the bars and set the OFF delay timer to 3 minutes
and connect the normally open contact of the OFF delay timer to the remote ON/
OFF terminal strip located on the rear of the power supply.
1. Determine the best location for the Pinner Superbar using the above applications
for guidance. For optimum performance, bars should be positioned away from all
ground references as shown in Figure 4.
1" from rear
2.5" from sides
1" from ends
1.5" from front
(3.0" if two
bars mounted
face-to-face)
Figure 4
2. Drill clearance holes in an insulating support frame (e.g., fiberglass, phenolic, delrin,
nylon, PVC) to accommodate the bar’s 1/4” mounting bolts.
3. Insert the head of each 5/16” nonconductive bolt into the keyhole slot in the rear of
the charging bar and secure to each mounting rod (see Figure 5).