9
Chargemaster Pinner Superbar
5101167 Rev. F
CAUTION –
Electrical Shock Hazard
Turn off power supply before connecting or disconnecting the high voltage cable.
4. Insert the cable (with spring loaded connector attached) into the power supply high
voltage connection. Screw in the knurled plug to secure the cable. NOTE – FINGER
TIGHTEN ONLY.
Install Optional Mounting Bracket (5051494)
CAUTION –
Electrical Shock Hazard
Ground all surrounding metal parts in the vicinity of the charging bar.
CAUTION –
Fire Hazard
Do not install or operate equipment in close proximity to any flammable solvents
or flammable materials.
1. The Optional Mounting Bracket is designed to fit the inside frame-to-frame
dimension on standard incline feed stackers. Position the assembled bracket between
the drive belt support idlers (see Figure 5A) with Super Pinner Bars set to maximum
open position (full up/down), centering the drive belts between the Super Pinner
Bars, and clamp bracket in position. Mark the frame for mounting hole (2 - 5/16”)
requirements on each side frame.
2. Remove mounting bracket assembly and drill holes in side frames. Secure mounting
bracket using 5/16” carriage bolts provided. Reset the Super Pinner Bars to 3”
separation, being sure to keep the drive belts centered between the static bars.
3. Route the high voltage cable for each charging bar along the machine frame or wall
to the power supply. Assure the cable is safely away from all moving parts and sharp
edges.
4. Verify that the high voltage cables are run separately from any control cables
associated with other electronic equipment. The EMI from high voltage cables may
interfere with the operation of sensitive electronic equipment.
5. Assure that the power supply is de-energized and turned off.