Operation Manual - Hobart 2400 Compact – 120 / 140 / 180 kVA
Operator’s Instructions
Document no. 578.430AB
Page 35 of 75
6.2
Operating the unit:
•
Insert the aircraft cable 1 or 2 / both into the aircraft. Make sure the cable(s) are fully inserted
Some cables have a line on the connector head to indicate when the head is fully inserted. The
plug may be equipped with a 90% switch/split “F” pin. In this case, the unit will not function if
the plug not is fully inserted.
•
Press the corresponding Start/Stop button
•
The unit is now in operation and ready to supply the aircraft with power.
This is also indicated via the green LED located close to the Start/Stop
button(s).
•
If the unit shuts off and is no longer supplying power to the aircraft, this is reported in clear text
in the display. Also a corrective action is displayed.
•
From the default display screen and during operation, various parameters can be viewed via the
display. Use the navigation keys
▼▲
to browse through the available screens:
OM2252
Rev 0 December 15 2016