RECEIVING THE PUMP
Inspect the pump as soon as it is received. Make notes of
damaged or missing items on the receipt and freight bill.
File any claims with the transportation company
immediately.
STORAGE REQUIREMENTS
Short Term
- (Less than 3 months) Goulds normal
packaging procedure is designed to protect the pump
during shipping. Upon receipt store in a covered and dry
location.
Long Term
- (More than 6 months) Preservative treatment
of bearings and machined surfaces will be required. Rotate
shaft several times every 3 months. Refer to driver and
coupling manuals for their long term storage procedures.
Store in a dry covered location.
HANDLING
s
!
WARNING
Failure to properly lift and support equipment could
result in serious injury or damage to pumps.
Use care when moving pumps. Lifting equipment must be
able to adequately support the entire assembly. Hoist bare
pumps, using a sling under the suction flange and bearing
housing. (Fig. 5)
s
!
WARNING
These pumps use ceramic silicon carbide components.
Do not drop pump or subject to shock loads, this may
damage internal ceramic components.
Baseplate mounted units are moved with slings under the
pump and driver. (Figs. 5 & 7)
3298 Family Rev. 4/07
13
2
Fig. 5
Fig. 6
Fig. 7
Содержание Goulds Pumps V 3298
Страница 6: ...6 3298 Family Rev 4 07 ...
Страница 26: ...26 3298 Family Rev 4 07 ...
Страница 32: ...32 3298 Family Rev 4 07 ...
Страница 38: ...38 3298 Family Rev 4 07 ...
Страница 106: ...SP 3298 S Group Frame Mounted Sizes 1 x 11 2 6 2 x 3 6 106 3298 Family Rev 4 07 SP3298 S Group Frame Mounted Version ...
Страница 112: ...112 3298 Family Rev 4 07 ...
Страница 115: ...3298 Family Rev 4 07 115 7 ...
Страница 116: ...INTERCHANGEABILITY 3298 XS GROUP 116 3298 Family Rev 4 07 ...
Страница 117: ...INTERCHANGEABILITY 3298 S GROUP 3298 Family Rev 4 07 117 7 ...
Страница 118: ...INTERCHANGEABILITY 3298 M GROUP INTERCHANGEABILITY 3298 M GROUP SIZE 1 x 3 8 ONLY 118 3298 Family Rev 4 07 ...
Страница 119: ...INTERCHANGEABILITY 3298 L GROUP 3298 Family Rev 4 07 119 7 ...
Страница 120: ...INTERCHANGEABILITY SP 3298 S GROUP 120 3298 Family Rev 4 07 ...
Страница 121: ...INTERCHANGEABILITY V 3298 S GROUP 3298 Family Rev 4 07 121 7 ...
Страница 122: ...INTERCHANGEABILITY V 3298 M GROUP 122 3298 Family Rev 4 07 ...
Страница 124: ...124 3298 Family Rev 4 07 ...
Страница 125: ...APPENDIX I 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 125 8 ...
Страница 126: ...3298 HYDRAULIC COVERAGE CHARTS 126 3298 Family Rev 4 07 ...
Страница 127: ...SP 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 127 8 ...
Страница 128: ...SP 3298 HYDRAULIC COVERAGE CHARTS 128 3298 Family Rev 4 07 ...
Страница 129: ...V 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 129 8 ...
Страница 130: ...V 3298 HYDRAULIC COVERAGE CHARTS 130 3298 Family Rev 4 07 ...
Страница 134: ...134 3298 Family Rev 4 07 ...
Страница 136: ...IMPELLER TRIM PROCEDURE 136 3298 Family Rev 4 07 Fig III 2 Group S M Fig III 3 Group L ...
Страница 142: ...142 3298 Family Rev 4 07 ...