RETURN OF MATERIALS
If it is necessary to return the pump to a Goulds factory or
repair facility for service, certain procedures must be
followed.
Do not return any parts without authorization from the
warranty engineer, a warranty claim number, and the
preprinted shipping label supplied by Goulds. In rare
instances because of the pumpage, ITT Goulds Pumps
Warranty Services may, at their option, decide not to have
the parts returned.
The parts being returned must be decontaminated prior to
shipment. The decontamination must be verified in
writing. The correct Material Safety Data Sheet (MSDS)
must accompany the parts along with decontamination
"sign off." This information is stated within the ITT
Goulds Pumps "decontamination procedure." The
Warranty Service engineer will send a copy of this
procedure to the customer. Please remember that
inspection of the parts cannot be started until we receive
the proper documentation. This is a safety and legal issue
and consequently strict adherence to procedure is
mandatory — there will be no exceptions.
Before shipping, check with your carrier for special
procedures that may be required when shipping highly
magnetic materials.
All pumps must be decontaminated prior to return. Refer
to
Preparation for Disassembly
and
Decontamination
Procedure
.
3298 Family Rev. 4/07
123
7
Содержание Goulds Pumps V 3298
Страница 6: ...6 3298 Family Rev 4 07 ...
Страница 26: ...26 3298 Family Rev 4 07 ...
Страница 32: ...32 3298 Family Rev 4 07 ...
Страница 38: ...38 3298 Family Rev 4 07 ...
Страница 106: ...SP 3298 S Group Frame Mounted Sizes 1 x 11 2 6 2 x 3 6 106 3298 Family Rev 4 07 SP3298 S Group Frame Mounted Version ...
Страница 112: ...112 3298 Family Rev 4 07 ...
Страница 115: ...3298 Family Rev 4 07 115 7 ...
Страница 116: ...INTERCHANGEABILITY 3298 XS GROUP 116 3298 Family Rev 4 07 ...
Страница 117: ...INTERCHANGEABILITY 3298 S GROUP 3298 Family Rev 4 07 117 7 ...
Страница 118: ...INTERCHANGEABILITY 3298 M GROUP INTERCHANGEABILITY 3298 M GROUP SIZE 1 x 3 8 ONLY 118 3298 Family Rev 4 07 ...
Страница 119: ...INTERCHANGEABILITY 3298 L GROUP 3298 Family Rev 4 07 119 7 ...
Страница 120: ...INTERCHANGEABILITY SP 3298 S GROUP 120 3298 Family Rev 4 07 ...
Страница 121: ...INTERCHANGEABILITY V 3298 S GROUP 3298 Family Rev 4 07 121 7 ...
Страница 122: ...INTERCHANGEABILITY V 3298 M GROUP 122 3298 Family Rev 4 07 ...
Страница 124: ...124 3298 Family Rev 4 07 ...
Страница 125: ...APPENDIX I 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 125 8 ...
Страница 126: ...3298 HYDRAULIC COVERAGE CHARTS 126 3298 Family Rev 4 07 ...
Страница 127: ...SP 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 127 8 ...
Страница 128: ...SP 3298 HYDRAULIC COVERAGE CHARTS 128 3298 Family Rev 4 07 ...
Страница 129: ...V 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 129 8 ...
Страница 130: ...V 3298 HYDRAULIC COVERAGE CHARTS 130 3298 Family Rev 4 07 ...
Страница 134: ...134 3298 Family Rev 4 07 ...
Страница 136: ...IMPELLER TRIM PROCEDURE 136 3298 Family Rev 4 07 Fig III 2 Group S M Fig III 3 Group L ...
Страница 142: ...142 3298 Family Rev 4 07 ...