1
2
3
4
5
6
Item Description
1.
Baseplate
2.
Foundation
3.
Sleeve
4.
Dam
5.
Bolt
6.
Grout
Figure 16: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
2
3
4
5
6
Item Description
1.
Baseplate
2.
Foundation
3.
Sleeve
4.
Dam
5.
Bolt
6.
Grout
Figure 17: Fill remainder of baseplate with grout
7.
Remove the leveling jackscrews after the grout hardens in order to remove any stress points.
4.5 Grout the baseplate
30
3620 i-FRAME API type BB2 single stage / ISO 13709 2nd Ed/API 11th Ed Installation, Operation, and Maintenance
Manual
Содержание GOULDS PUMPS i-FRAME 3620
Страница 2: ......