5 Preventative Maintenance
5.1 General comments
A routine maintenance program can extend the life of your mixer. Well maintained equipment will last lon-
ger and require fewer repairs. You should keep maintenance records, this will help pinpoint potential
causes of problems.
5.2 Maintenance schedule
Routine Maintenance
•
Bearing lubrication
•
Seal Monitoring
•
Vibration analysis
•
Temperature monitoring
Routine Inspections
•
Check level and condition of oil through sight glass on bearing housing.
•
Check for unusual noise, vibration and bearing temperatures.
•
Inspect mixer and piping for leaks.
•
Check seal chamber leakage.
•
Mechanical Seal: Should be no leakage.
Quarterly Inspections
•
Check foundation and hold-down bolts for tightness.
•
Oil should be changed at least every 3 months or more often if there are any adverse atmospheric
conditions or other conditions which might contaminate or break down the oil.
•
Grease lubricated bearings should be regreased every 3 months.
Annual Inspections
•
Check mixer capacity, and power. If mixer performance does not satisfy your process requirements,
the mixer should be disassembled and inspected. Worn parts should be replaced.
5.3 Maintenance of bearings
5.3.1 Oil lubricated bearings
Oil lubricated bearings must be lubricated at the job site. Remove fill plug (408H) and add oil until level is
at the center of the sight glass (319). Replace fill plug.
5 Preventative Maintenance
3501 Installation, Operation, and Maintenance Instructions
29
Содержание Goulds Pumps 3501
Страница 1: ...Installation Operation and Maintenance Instructions 3501 ...
Страница 2: ......