Figure 1: Mixer casing tag - English
Figure 2: Mixer casing tag - metric
Figure 3: Bearing frame tag
2.3 Receiving the mixer
Inspect the mixer as soon as it is received. Carefully check that everything is in good order. Make notes
of damaged or missing items on the receipt and freight bill. File any claims with the transportation com-
pany as soon as possible.
2.3.1 Storage Requirements
Short Term: (Less than 6 months):
Goulds normal packaging procedure is designed to protect the mixer during shipping. Upon receipt store
in a covered and dry location.
2.3 Receiving the mixer
10
3501 Installation, Operation, and Maintenance Instructions
Содержание Goulds Pumps 3501
Страница 1: ...Installation Operation and Maintenance Instructions 3501 ...
Страница 2: ......