1.
Clean all the areas of the baseplate that will come into contact with the grout.
2.
Build a dam around the foundation.
3.
Thoroughly wet the foundation that will come into contact with the grout.
4.
Pour grout through the grout hole into the baseplate up to the level of the dam.
When you pour the grout, remove air bubbles from it by using one of these methods:
•
Puddle with a vibrator.
•
Pump the grout into place.
5.
Allow the grout to set.
1
2
3
4
5
6
Item Description
1.
Baseplate
2.
Foundation
3.
Sleeve
4.
Dam
5.
Bolt
6.
Grout
Figure 17: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
4.5 Grout the baseplate
34
Model 3393 Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS 3393
Страница 1: ...Installation Operation and Maintenance Manual Model 3393 ...
Страница 2: ......
Страница 67: ...6 5 Disassembly Model 3393 Installation Operation and Maintenance Manual 65 ...
Страница 69: ...6 5 Disassembly Model 3393 Installation Operation and Maintenance Manual 67 ...
Страница 73: ...6 5 Disassembly Model 3393 Installation Operation and Maintenance Manual 71 ...
Страница 76: ...6 5 Disassembly 74 Model 3393 Installation Operation and Maintenance Manual ...
Страница 77: ...6 5 Disassembly Model 3393 Installation Operation and Maintenance Manual 75 ...
Страница 78: ...6 5 Disassembly 76 Model 3393 Installation Operation and Maintenance Manual ...
Страница 81: ...6 5 Disassembly Model 3393 Installation Operation and Maintenance Manual 79 ...
Страница 82: ...6 5 Disassembly 80 Model 3393 Installation Operation and Maintenance Manual ...
Страница 92: ...6 7 Reassembly 90 Model 3393 Installation Operation and Maintenance Manual ...
Страница 97: ...6 7 Reassembly Model 3393 Installation Operation and Maintenance Manual 95 ...
Страница 100: ...6 7 Reassembly 98 Model 3393 Installation Operation and Maintenance Manual ...
Страница 101: ...6 7 Reassembly Model 3393 Installation Operation and Maintenance Manual 99 ...