read the Total Energy Registers (TER) values
read all instantaneous values
read the meter status values and its configuration
erase any non-fatal alarms
7.
Carry out the LCD test and confirm all the display segments and annunciator icons are lit.
8.
Wait for approx 15 minutes while the meter operates.
9.
Check the TER values have incremented from their initial values.
10.
Check the maximum demand value is consistent with the applied load.
11.
Re-check meter status.
If the support tool 'Toolbox' application is available:
1.
Use the Toolbox functions to verify all aspects of meter operation.
2.
Save and print the results as evidence of correct operation.
10.10.
Sealing the meter
Before leaving the installation site, fit the terminal cover, and seal the meter against unauthorised access or
tampering by fitting wire or plastic seals in the following locations:
1
Battery holder
Underneath hinged front panel
2
Main cover
3
Hinged front panel
4
Terminal cover
Содержание ACE6000
Страница 1: ...ACE6000 User Guide...
Страница 6: ...ACE6000 User Guide 4...
Страница 8: ...ACE6000 User Guide 6...
Страница 12: ...ACE6000 User Guide 10...
Страница 14: ...ACE6000 User Guide 12...
Страница 22: ...ACE6000 User Guide 20...
Страница 42: ...ACE6000 User Guide 40...
Страница 80: ...ACE6000 User Guide 78...