ACE6000 User Guide
76
10.7.
Battery
The meter is designed so the lithium battery can be safely installed or replaced while the meter is operating, as
follows:
1.
Unseal and open the hinged front cover.
2.
If fitted, remove the seal from the battery holder.
3.
Gripping the battery holder (1) as shown, gently pull it out from the meter until the stop is reached.
4.
The meter may be initially shipped with the battery in the forward slot, this is the disconnected position (2). If
this is the case, slide the battery to remove it and place in the rearmost slot, this is the connected position
(3).
Due to the design of the battery holder it is not possible to slide the battery in the wrong way round.
If the battery is being replaced, ensure the new one is fitted in the connected position.
5.
Firmly push the battery holder back into the meter until it clicks into position.
6.
Using the meter support tool, clear any battery error indications/alarms and reset the battery expected life
time value.
7.
Re-seal the meter as necessary.
10.8.
Installation checks
Before connecting the mains supply to the installed meter, carefully check that:
the correct meter type with the right identification number has been installed for this client at this metering
point.
all mains supply and auxiliary cables are connected to the correct terminals.
all cable clamp screws are securely tightened.
the battery has been correctly installed.
10.9.
Start-up and functional checks
Take the following steps to check that the meter is functioning.
1.
Connect the mains supply to the meter.
2.
Check that the LCD display turns on and shows coherent displays.
Depending on the meter configuration, the LCD may move automatically through a sequence of displays, or
it may be necessary to use the meter display pushbutton to move through the sequence.
3.
Check that the meter is in the start mode (STOP is not displayed).
4.
Check the phase sequence is correct; the quadrant indicator icons in the LCD should not be flashing.
5.
Apply a load to the meter and check that the metrology LED (active - kWh) starts to flash.
The flash rate is proportional to the load.
6.
Using the IR port, connect a support tool enabled PC to the meter and:
Содержание ACE6000
Страница 1: ...ACE6000 User Guide...
Страница 6: ...ACE6000 User Guide 4...
Страница 8: ...ACE6000 User Guide 6...
Страница 12: ...ACE6000 User Guide 10...
Страница 14: ...ACE6000 User Guide 12...
Страница 22: ...ACE6000 User Guide 20...
Страница 42: ...ACE6000 User Guide 40...
Страница 80: ...ACE6000 User Guide 78...