![Italkero QUADRO 40 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/italkero/quadro-40/quadro-40_installation-and-maintenance-manual_2094810021.webp)
1
Before proceeding with the first ignition, check the fol-
lowing points:
•
ATTENTION! BEFORE TURNING ON THE EQUIP-
MENT, CAREFULLY READ ALL THE INSTRUC-
TIONS AND WARNINGS CONTAINED IN THIS
BOOKLET.
1) turn on only if all the components have been fixed
and are stable
2) open the main gas valve that was fitted before the
appliance valve
3) check the leakage of the gas circuit as far as the
appliance valve
4) turn on the appliance by turning the main switch to
"I”.
5) make sure the valve knobs are in the correct posi-
tion (1)
6) switching on the appliance:
- Point the remote control towards the sensor and
simultaneously press the “spark” and “UP triangle”
keys on the supplied remote control.
Aim the remote control directly at the sensor
at A maximum distance of 3m avoiding
interference with front light sources or obstacles.
- A beep will signal the start of the start sequence.
7) device adjustment:
- Once switched on, it is possible to choose the power
level of the appliance using the remote control.
- Press the “triangle DOWN” button on the remote
control to reduce the intensity of the flame.
- Press the "UP tr spark” keys to increase the
flame intensity.
Increasing the intensity of the flame through
the use of two keys is a safety measure
designed by the Manufacturer to avoid involuntary
and sudden flames.
8) at this point check all the automatic phases in se-
quence:
- presence of spark on pilot burner
- ignition of the two flames on the pilot burner (one for
the “thermocouple” safety system and the other for ig-
nition of the main burner flame
- ignition of the main burner throughout its width at ma-
ximum flow rate
NOTE during the first ignition it is probable that the fla-
mes on the pilot burner may not ignite rapidly. This
is due to the fact that the air present in the gas circuit
must first come out completely. Do not force this
process but repeat the ignition with remote control also
respecting the times of the valve itself.
9) At this point check correct operation of the valve by
lowering and raising the flames of the main burner and
completely extinguishing the appliance.
10) After ten minutes of operation, check correct ope-
ration of the conveyor hood and of the flue duct by
placing a match on the edge of the hood and check
that the flame is oriented with the tip towards the inside
of the flue duct.
11) The final phase is the furnishing of the firebox with
the accessories provided in accordance with the speci-
fic instructions attached.
FIRST IGNITION
TECHNICAL ASSISTANCE
21
Содержание QUADRO 40
Страница 1: ...Gas heating firebox insert INDOOR USE QUADRO 40 INSTALLATION and MAINTENANCE...
Страница 26: ...USEFUL INFORMATION TECHNICAL ASSISTANCE 26...
Страница 27: ...NOTE...
Страница 28: ...3520300123 r0 0063 CU3238...
Страница 29: ...Gas heating firebox insert INDOOR USE QUADRO 40 USER...
Страница 39: ...11 3 2 4 1 5 6 7 8 11 12 10 9 13...
Страница 40: ...3520300123 r0...