![Italkero Poster PE t1 30 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/italkero/poster-pe-t1-30/poster-pe-t1-30_installation-and-technical-manual_2094805026.webp)
26
CUSTOMER SERVICE
In the case that you are going to verified processor
control box (p.c.b assy) malfunction:
- Push the reset button like in the picture.
-At the start verified that the gas pressures are as
under the Table.
- The gas pressure value has to be as in the table.
- The apparatus execute a stop, and next restart.
--- Operating from the main control panel
--- Operate on the atmospheric thermostat or the
timer.
- The fan starts when Processor control box gives
the consent.
1
2
3
4
5
6
7
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
PROCESSOR CONTROL BOX (P.C.B ASSY) MALFUNCTION
3
2
1
MODELLO
30
50
G 2 0
1 2
1 2
G 3 0
2 8 , 8
2 8 , 8
G 3 1
3 6 , 7
3 6 , 6
mbar
mbar
70
1 2
2 8 , 8
3 6 , 5
mbar
nom.
nom.
nom.
90
1 0
2 7 , 4
3 4 , 5
mbar
CONTROLS DURING THE FIRST & AFTER STARTING SERVICE
Содержание Poster PE t1 30
Страница 1: ......
Страница 37: ...37 NOTE NOTE ...
Страница 38: ...38 NOTE NOTE ...
Страница 39: ......
Страница 40: ...35200097 Rev 1 10 2006 ...
Страница 41: ......
Страница 47: ...user 7 CONVECTOR POSTER Fox PE GAS CONVECTOR TYPE C FOR HEATING ...
Страница 56: ...user 35200097 Rev 1 10 2006 ...