7
ENGLISH
UnPacKing
PRePaRation anD UnPacKing
The packaging materials are neither toxic nor noxious
and do not require special disposal.
The end user is responsible for storing, disposing of
and recycling them in a regulatory fashion.
Always move the stove vertically with
suitable equipment and in observance of
safety regulations.
Do not turn the package over, and handle
all parts requiring installation with care.
PacKaging
(details in the cladding paragraph)
The delivery consists of 3 packages:
• one
(1)
containing the stove’s frame
• one
(2)
containing the ceramic panels
• one
(3)
containing the metal sides
The package with the stove contains:
• warranty certificate,
• glove,
• this manual,
• power cable,
• air outlet grille for top
(g)
,
• the removable handle for opening the combustion
chamber door with the small parts required for
fitting the cladding
(M)
.
®
installeR
g
M
1
2
3
Содержание LAYMA IDRO 18
Страница 1: ...LAYMA IDRO 18 22 GB Installation use and maintenance page 2 Pellet boiler stove...
Страница 34: ......
Страница 35: ......
Страница 36: ...code 941394 GB 05 17 C 941394 GB...