Summary

1.

 

WARNING:

 

 

Fireplace and chimney systems will only draught prop

-

erly when they are installed according to the instructions, in an 

appropriate location and with the proper chimney height. Install

-

ing the fireplace according to the instructions, choosing an ap

-

propriate location, and choosing an appropriate chimney height 

are the responsibility of the designer and the building contractor.

 

Tightly insulated and sealed homes, two story interior 

spaces and high vaulted ceilings can cause negative air pressures 

within the house which can impair drafting performance. HVAC 

return air ducts near the fireplace opening will adversely affect 

the fireplace drafting performance.

 

It is the responsibility of the designer, the building 

contractor and their mechanical contractor to determine that the 

building’s internal air pressures are conducive to positive fire

-

place drafting.

 

Avoid placing any fireplace in an area near tall trees, tall 

buildings, or high land masses. These structures can reduce am-

bient air flow pressure as well as produce down draughts, either 

of which can impair fireplace drafting performance.

 

Earthcore Industries L.L.C. does not warrant drafting 

and is not responsible for it.

2. Standard EPA qualified fireplace and Fire-Lite Fireplace 

Curing Instructions:

 

It is critical that the Isokern masonry elements in the

firebox and smoke dome assembly be dry before firing of the 

unit. Moisture left in the components from exposure during stor

-

age and shipping, as well as moisture from the installation phase, 

must be eliminated before the unit is put to its intended use.

 

The first step in reducing the ambient moisture is to be 

sure that the completed fireplace rest totally in a dried-in setting 

for a minimum of 28 days after construction of the unit is com

-

plete.

 

The next step in curing the fireplace is to be sure that 

the first five or six fires are of short duration.

 

The first fire of the unit can take place once the mini

-

mum twenty-eight day drying period has passed. This fire should 

be especially short.

 

Start the first fire slowly with a small amount of paper 

and kindling (small dry wood splits or twigs) and a maximum 

load of four to six pounds of dry firewood, estimated to be no 

more than two or three logs each of about three inches (3”) to 

four inches (4”) diameter.

 

The first fire should burn for no more than thirty to sixty 

minutes and then allowed to go out. Do not refuel the fireplace 

during the first lighting.

 

A cooling off period of twenty-four hours, at a mini

-

mum, should follow the first fire.

 

The second fire should be the same as the first fire.

 

The second fire should burn for no more than thirty to 

sixty minutes and allowed to go out. Do not refuel the fireplace 

during the second lighting.

 

A twenty-four hour cooling off period must be 

observed following second lighting.

After first and second fire, continue use of the unit with three 

or four small fires of short duration (sixty minutes or so) and 

small fuel load.

 

After these first five or six small fires of short dura

-

tion normal use of the fireplace can proceed. For normal use 

the maximum recommended fuel load is twelve to sixteen 

pounds of dry firewood at a time. This fuel load is consid

-

ered to be approximately three to five cured hardwood logs

of about three inches (3”) to six inches (6”) in diameter. As 

the fire burns down, refueling should be only one or two logs 

added at a time.

Important:

 Do not burn construction debris or trash of any 

kind in the Fire-Lite fireplace.

 

Whereas it is not uncommon for construction debris 

and refuse to be burned in a fireplace by site personnel on 

a project that is under construction, this activity must be 

avoided.

 

It is the responsibility of the building contractor 

to insure that the required dry-in period is met and that the 

required lighting sequence is performed by the owner or by 

the owner’s agent.

3. Log grates are required for burning solid fuel in the 

Isokern fireplace.

 Grates allow for easy air flow up through 

the burning logs thus creating a more complete and efficient 

burning of the fuel.

4. How to Build a Fire:

 

First set the fireplace damper in the full open posi

-

tion. Begin laying the fire by placing several pieces of wad

-

ded up paper directly on the log grate. Place kindling (small 

splits of dry pine or other dry softwood) on top of the paper, 

enough to loosely cover the paper. Next arrange several 

small, dry hardwood or softwood logs or log splits on top of 

the kindling layer.

 

Finally, arrange two or three larger hardwood logs 

(oak, hickory, etc.) or log splits on top of the stack.

Ignite the paper at the bottom of the stack. The burning 

paper will ignite the kindling which will, in turn, set the 

remaining fuel on fire.

 

Be sure to stack all firewood in such a way that it 

will settle into the log grate as the paper and kindling layers 

are burned away. Additional logs can be set onto the fire as 

each fueling burns down.

 

Ideally, fuel logs should be of a hardwood species 

that have been air dried for one year or longer. Use of cured 

or uncured pine logs and uncured hardwood logs for fuel 

should be avoided. Pine logs and uncured hardwood logs 

will tend to smolder and burn at relatively low temperatures 

producing high levels of soot and creosote.

Important:

 Do not throw, toss, jam, kick or otherwise force 

logs into the fireplace.

Содержание EPA Qualified 36 C

Страница 1: ...n sizing and operation instructions It is the responsibility of the general contractor to provide adequate clearances from all firebox surfaces as specified in this manual INSTALLER Leave this manual...

Страница 2: ...Listing Label and EPA Hangtag Assembled Firebox Smoke Dome Dimensions Component List Dimensions Required Clearance to Combustibles Assembly Instructions 36 C Access Modification Firebrick Installatio...

Страница 3: ...block and an inner liner with a fourteen inch 14 di ameter flue hole The chimney components are field assembled using Earthcore Mortar to glue the components together The DM 54 chimney system also in...

Страница 4: ...nstruction debris or other highly flammable material tossing kicking or otherwise forcing logs into the firebox Standard EPA qualified fireplace and DM 54 chimney systems are conventional indoor or ou...

Страница 5: ...the normal firing process In the event the home is tightly sealed and has modern energy efficient features the optional combustion air supply kits may not provide all the air required to support combu...

Страница 6: ...d to obtain a permit MANUFACTURER EARTHCORE INDUSTRIES LLC MODEL NO Series 36 C PARTICLE EMISSIONS 2 93 GRAMS KG OF WOOD BURNED For proper operation catalyst must be replaced every 3 to 5 years FIREPL...

Страница 7: ...gen and moisture in the form of water vapor The Catalytic Combustor system is a technology that provides secondary combustion for the wood burning process Avoid the use of treated painted and laminate...

Страница 8: ...dealer near you Base Plate Part No Model Qty No 21 36 1 Model A 36 43 Smoke Dome Small Part No Model Qty No 12 36 2 Smoke Dome Medium Part No Model Qty No 11 46 2 SideWall Part No Model Qty No 20 36 6...

Страница 9: ...the firebox opening Drywall must be cut 2 back from the firebox opening sides and 8 above the top of the opening Notes A The Standard EPA qualified fireplace fireplace is rated for installation on a c...

Страница 10: ...ds of the Earthcore Mortar to the area to assure proper sealing of the joint Properly mortared firebox and smoke dome assembly re quires approximately 25 pounds dry measure of Earthcore mortar Broken...

Страница 11: ...tform Whether a flush hearth is preferred or a raised hearth the combustible floor on front of the fireplace must be covered with a noncombustible hearth extension set tight against the fire place fro...

Страница 12: ...ic assembly out of the box and verify all components are in tact and Yellow EPA hangtag is attached to the filter The Catalytic kit should contain a Catalytic Combustor 6 diameter flue pipe 24 tall an...

Страница 13: ...ate into position on top of the smoke dome wall assembly One side of the smoke dome top plate shows a thickened center This side is the bottom face of the top plate The fourteen inch 14 diameter flue...

Страница 14: ...om the Standard EPA qualified fireplace Few to no bends with a maximum length of sixty feet 60 WARNING Do not use combustible duct material Avoid installing a combustion air inlet where the opening co...

Страница 15: ...kwork however this is just a suggestion and other face joint dimensions are also acceptable Step 1 Wet mop the inside of the Standard EPA qualified fireplace with a damp sponge to remove dust and loos...

Страница 16: ...nd fire should be the same as the first fire The second fire should burn for no more than thirty to sixty minutes and allowed to go out Do not refuel the fireplace during the second lighting A twenty...

Страница 17: ...ting season in colder climates thoroughly inspect the Fire Lite fireplace and chimney system Chimneys must be installed so that access is provided for inspection and cleaning The chimney should be ins...

Страница 18: ...directions in manufacturers operating manual For warranty purposes proof of fireplace or HearthCAT purchase is required Labor for removal and or re installation of the catalytic component is not the r...

Страница 19: ...rief description of the defect ISOKERN or any division thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components ISOKERN is not responsible...

Отзывы: