Isokern EPA Qualified 36 C Скачать руководство пользователя страница 10

10

General Isokern Assembly Instructions: 

 

Earthcore Mortar (a thin-set type masonry adhesive) is 

used to glue all Isokern components together during field assembly 

of the unit. The mortar is supplied dry, in either 15 pound or 50 

pound pails. 

 

Earthcore mortar is mixed with clean water to a smooth, 

workable texture (without lumps or dry pockets) of a “toothpaste” 

consistency. This mixture is suitable for application onto Isokern 

components by using a masonry grout bag supplied with the unit. 

 

Attention should be paid that the mortar mixture is not too 

thin or runny, as this will not allow the mortar to reach its maximum 

bonding strength. 

 

Earthcore mortar is squeezed from a grout bag onto the 

contact surfaces of the Isokern components as they are fitted 

together. 

 

It is important that a 1/2” bead of mortar on all the compo

-

nents’ contact surfaces is applied at about 1/2” in from all edges of 

the contact surface of the component. 

 

When setting the next component onto the mortared con

-

tact surface of the first component, some mortar should squeeze out 

along the face of the entire joint as a sign of complete and proper 

sealing of the joint. 

 

On broader contact surfaces it is advisable to apply several 

additional 1/2” beads of the Earthcore Mortar to the area to assure 

proper sealing of the joint. 

 

Properly mortared firebox and smoke dome assembly re

-

quires approximately 25 pounds (dry measure) of Earthcore mortar. 

Broken Components: 

 

Components broken into 2 or 3 pieces can be repaired by 

using Earthcore mortar along the break line as the component is set 

into place. Components broken into multiple small pieces should be 

discarded and replaced. 

Leveling and Aligning Components: 

 

Be sure to assemble all Isokern components level and flush 

with adjoining components. 

 

Earthcore mortar is not intended to create a mortar joint 

of any thickness for leveling purposes. Therefore, leveling and 

alignment adjustments are made by the use of small plastic shims 

supplied with the unit. 

 

The shims can be inserted under a component to level and 

align it with adjacent Isokern components. Be sure to re-grout any 

and all gaps resulting from shim insertion to maintain components 

to full bearing.

Notes: 

1. Do not mix Earthcore mortar with spirits or anti-freeze agents. 

2. The maximum recommended mortar joint thickness at Isokern 

components is 1/4”. 

3. Earthcore mortar can be troweled over the face of a joint where 

it has squeezed out while setting components. It is not intended that 

the exposed faces of the Isokern components be completely covered 

with the mortar.

Assembly Instructions - 36 C

Earthcore Mortar

Shim if required
to acheive 
correct height

Содержание EPA Qualified 36 C

Страница 1: ...n sizing and operation instructions It is the responsibility of the general contractor to provide adequate clearances from all firebox surfaces as specified in this manual INSTALLER Leave this manual...

Страница 2: ...Listing Label and EPA Hangtag Assembled Firebox Smoke Dome Dimensions Component List Dimensions Required Clearance to Combustibles Assembly Instructions 36 C Access Modification Firebrick Installatio...

Страница 3: ...block and an inner liner with a fourteen inch 14 di ameter flue hole The chimney components are field assembled using Earthcore Mortar to glue the components together The DM 54 chimney system also in...

Страница 4: ...nstruction debris or other highly flammable material tossing kicking or otherwise forcing logs into the firebox Standard EPA qualified fireplace and DM 54 chimney systems are conventional indoor or ou...

Страница 5: ...the normal firing process In the event the home is tightly sealed and has modern energy efficient features the optional combustion air supply kits may not provide all the air required to support combu...

Страница 6: ...d to obtain a permit MANUFACTURER EARTHCORE INDUSTRIES LLC MODEL NO Series 36 C PARTICLE EMISSIONS 2 93 GRAMS KG OF WOOD BURNED For proper operation catalyst must be replaced every 3 to 5 years FIREPL...

Страница 7: ...gen and moisture in the form of water vapor The Catalytic Combustor system is a technology that provides secondary combustion for the wood burning process Avoid the use of treated painted and laminate...

Страница 8: ...dealer near you Base Plate Part No Model Qty No 21 36 1 Model A 36 43 Smoke Dome Small Part No Model Qty No 12 36 2 Smoke Dome Medium Part No Model Qty No 11 46 2 SideWall Part No Model Qty No 20 36 6...

Страница 9: ...the firebox opening Drywall must be cut 2 back from the firebox opening sides and 8 above the top of the opening Notes A The Standard EPA qualified fireplace fireplace is rated for installation on a c...

Страница 10: ...ds of the Earthcore Mortar to the area to assure proper sealing of the joint Properly mortared firebox and smoke dome assembly re quires approximately 25 pounds dry measure of Earthcore mortar Broken...

Страница 11: ...tform Whether a flush hearth is preferred or a raised hearth the combustible floor on front of the fireplace must be covered with a noncombustible hearth extension set tight against the fire place fro...

Страница 12: ...ic assembly out of the box and verify all components are in tact and Yellow EPA hangtag is attached to the filter The Catalytic kit should contain a Catalytic Combustor 6 diameter flue pipe 24 tall an...

Страница 13: ...ate into position on top of the smoke dome wall assembly One side of the smoke dome top plate shows a thickened center This side is the bottom face of the top plate The fourteen inch 14 diameter flue...

Страница 14: ...om the Standard EPA qualified fireplace Few to no bends with a maximum length of sixty feet 60 WARNING Do not use combustible duct material Avoid installing a combustion air inlet where the opening co...

Страница 15: ...kwork however this is just a suggestion and other face joint dimensions are also acceptable Step 1 Wet mop the inside of the Standard EPA qualified fireplace with a damp sponge to remove dust and loos...

Страница 16: ...nd fire should be the same as the first fire The second fire should burn for no more than thirty to sixty minutes and allowed to go out Do not refuel the fireplace during the second lighting A twenty...

Страница 17: ...ting season in colder climates thoroughly inspect the Fire Lite fireplace and chimney system Chimneys must be installed so that access is provided for inspection and cleaning The chimney should be ins...

Страница 18: ...directions in manufacturers operating manual For warranty purposes proof of fireplace or HearthCAT purchase is required Labor for removal and or re installation of the catalytic component is not the r...

Страница 19: ...rief description of the defect ISOKERN or any division thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components ISOKERN is not responsible...

Отзывы: