13
Assembly Instructions - 36 C
Note:
The smoke dome sloping sidewalls have a bev
-
eled bottom edge so that they will sit tight onto the flat
top of the side walls.
Step 12: Make sure that all component contact surfaces
have been properly sealed with approved mortar.
Check smoke dome front and back walls to see
that they are plumb, level and in alignment with mating
components.
Check alignment of the smoke dome sloping
sidewall components to see that they are fully seated.
Step 13: Set the smoke dome top plate into position on
top of the smoke dome wall assembly.
One side of the smoke dome top plate shows a
thickened center. This side is the bottom face of the top
plate.
The fourteen inch (14”) diameter flue hole in
the top plate is centered in the smoke dome from side to
side but is offset from front to back.
Make sure that the top plate is set so that the
flue hole is closer to the back wall of the smoke dome
assembly.
Be sure to set the smoke dome top plate flush
with the front, back and sides of the smoke dome assem
-
bly. All contact surfaces must be properly sealed with the
approved mortar.
Note:
The completed smoke dome assembly should
present a stable and level surface for setting the flue
components.