TH4295,4335,4365
108
FACTORY RECOMENDED
NEW TRACTOR PRE-DELIVERY INSPECTION CHECK LIST
ISEKI
USE
R’S NAME
AREA
DATE
DEALER
ADDRESS
TRACTOR MODEL
SERIAL NO.
ENGINE SERIAL NO.
COUNTRY
Y
THIS PRE-DELIVERY INSPECTION CHECK LIST IS PROVIDED TO IDENTIFY THE CHECKED AND NECESSARY
ADJUST BY THE DEALER PRIOR TO DELIVERY OF THIS MACHINE.
Inpsected the following and adjusted if necessary.
ENGINE
Radiator filled with solution
Engine RPM (full throttle)
Cooling system connections
Governor performance
Fan and alternator belt tension
Electrical connections
Engine oil
Service air cleaner
All oil drain plugs
All cleaner connections
Oil pressure
Fuel line connections
Engine RPM (idle)
Injection pump oil
CHASSIS
Tyre inflation
Hydraulic system performance
Front wheel hub bolts
Drive test
Rear wheel hub bolts
Lubricate all grease fittings
Torque all chassis bolts
Power-assisted streering operation (if equipped)
Transmission oil
Front axele oil (4-WD)
Front reduction case
Front axele operation (4-WD)
Break pedal free-play
Operation manual with tractor
Clutch pedal free-play
Explained the following to the owner.
Operation manual
Fuel system servicing and cleanliness
Safety and safety start system
Draining of engine and radiator
Instruments and controls
Air cleaner service
Breaking in the new tractor
Tyre care
Power take-off operation
Wheel tread adjustment
Lubrication and maintenance schedule
Storage
Explain use of Rollover Protective Structure (ROPS)
Содержание TH4295
Страница 1: ...TH4295 TH4335 TH4365 MODELS I S E K I T R A C T O R S ...
Страница 3: ......