background image

Leaflet Number P85491 Issue 1

www.iQE.co.uk
Trade House BA22 8RT

11

Содержание CP017

Страница 1: ...ree on off periodsa day with a one hour boostand instantadvancefacility Installation and connection should only be carried out by a suitably qualified person and in accordance with the current editionof the IEE wiringregulations WARNING Isolatemainssupplybeforecommencinginstallation 1 ...

Страница 2: ...ted remembering that the backplate fits to the left hand end of the control Mark the fixing positions through the slots on the backplate fixing centres of 60 3mm drill and plug the wall then secure the backplate in position The slots in the backplate will compensate for any misalignments of the fixings Wiring box mounting The backplate may be fitted directly onto a single gang steel flush wiring b...

Страница 3: ...rth connection is provided on the backplate for terminating cable earth connectors Earth continuity must be maintained and all bare earth connectors must be sleeved Ensure no earth conductors are left protruding outside the central space enclosed by the backplate Internal wiring diagram CP017 New Installations Example circuit diagrams for some typical installations are shown on pages 4 5 and 6 The...

Страница 4: ...iring detail can be applied to the corresponding models of most manufacturers Cylinder and Room Thermostat key C Common CALL Call for heat or break on rise SAT satisfied on rise N neutral 1 Typical combination boiler installation N L 1 2 3 4 MAINS SUPPLY E N L FOR PRECISE TERMINAL CONNECTION INFORMATION PLEASE RFFER TO BOILER MANUAL INSTRUCTIONS COMBINATION BOILER TERMINALS E N L REMOVE LINK IF FI...

Страница 5: ...ing circuit N L 1 2 3 4 MAINS SUPPLY E N L FOR PRECISE TERMINAL CONNECTION INFORMATION PLEASE RFFER TO BOILER MANUAL INSTRUCTIONS COMBINATION BOILER TERMINALS E N L REMOVE LINK IF FITTED BOILER LIVE OUT TERMINALS L2 SHOULD NOT BE LINKED ROOM STAT SAT CALL C N PUMP BOILER L N N L 1 2 3 4 MAINS SUPPLY E N L SAT CALL CYL STAT C ROOM STAT C N SAT ZONE VALVE CALL ...

Страница 6: ...4 Gravity primary with pumped Heating via Room Stat and Cylinder Stat BOILER L N N L 1 2 3 4 MAINS SUPPLY E N L SAT CALL CYL STAT C ROOM STAT C N SAT CALL BOILER L N 6 ...

Страница 7: ...ry reserve The battery must be commissioned prior to fitting the control to the backplate This is achieved by the means of a commissioning strip situated in the back of the unit Pull out the battery commissioning strip at the back of the timeswitch and re insert the battery the reserve is now activated When the timeswitch is running the battery reserve clock display will disappear This is to prolo...

Страница 8: ... the backplate ensuring the lugs on the backplate engage with the control Swing the bottom of the control into position ensuring that the connection pins on the back of the unit locate into the terminal slots in the backplate Tighten the two captive retaining screws to fix the unit securely Then switch on the mains supply On completion of the installation please reset the timeswitch detailed below...

Страница 9: ...how to operate the controls and hand over the users operating instructions to the user SET SELECT Resetting the timeswitch On the CP017 press the SET and SELECT buttons together Then release the buttons and the timeswitch will return to preset factory settings The preset factory settings are illustrated on page 6 of the USER GUIDE The unit can now be programmed to suit the user s requirements Plea...

Страница 10: ...s continuous operation minimum Case material Thermoplastic flame retardant Dimensions 84mm x 150mm x 29mm Clock 12 hour AM PM Auto BST GMT changeover Display Back lit liquid crystal Displayed time adjustments 1 minute steps Switched time adjustments 10 minute steps Operating periods per day 3 per day Override 1 hour boost 1 hour extension to On period instant advance Mounting Industry standard 6 t...

Страница 11: ...Leaflet Number P85491 Issue 1 www iQE co uk Trade House BA22 8RT 11 ...

Отзывы: