RBU100H operation manual 2 Inspection
-5-
(reactors and brake resistors) are away from flammable materials.
4. Check that all control cables and power cables are run separately and the routation
complies with EMC requirement.
5. Check that all grounding systems are properly grounded according to the requirements
of the RBU.
6. Check that the free space during installation is sufficient according to the instructions in
user’s manual.
7. Check that the external connection terminals are tightly fastened and the torque is
appropriate.
8. Check that there are no screws, cables and other conductive items left in the RBU. If not,
get them out.