
RBU100H operation manual
4 Installation guidelines
-13-
The input filter is optional.
The fuse is optional. Configure the fuse at 1.5 times of the rated current of the RBU.
4.5.2 380V 55kW
–250kW/660V 55kW–400kW
R
S
T
U
V
W
R
S
T
r
s
t
S1
S2
S3
S4
COM
24V
Y
COM
M
Regenerative
reactor
ROB
ROA
ROC
PE
PE
AO
GND
CN9
(+)
(-)
(-)
(+)
Power supply
Input filter
Input
reactor
VFD
It is recommended to use fuse.
Regenerative system
RBU
Port of external keypad
Open collector output
RO
Figure 4-6 Standard wiring of RBU 380V 55kW
–250kW/660V 55kW–400kW
Note:
RBU 380V 55kW
–250kW/660V 55kW–400kW has standard input/output reactor.
Input filter is optional.
The fuse is optional. Configure the fuse at 1.5 times of the rated current of the RBU.
4.6 Parallel connection
4.6.1 Parallel connection of RBU100H (M-S configuration)
Steps:
1. Master setting:
1) P0.17=2;
2) Select P0.00=1 (terminal control);
3) Set as manual mode or automatic mode.
2. Slave setting:
1) Connect Y and COM of the master to S2 and COM of the slave;
Содержание RBU100H
Страница 1: ...RBU100H Regenerative Energy Unit...
Страница 33: ...66001 00144...