![INVT GD300L Series Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/invt/gd300l-series/gd300l-series_operation-manual_2085743011.webp)
Goodrive300-LIFT series inverter
Precautions for quick application
-7-
2.6
Basic commissioning
Complete the basic commissioning as follows before using the inverter.
1. Select the motor type and set the motor parameters according to the actual motor
parameters, and set the control mode of the inverter.
2. Perform autotuning if required. Remove the motor load, if possible, to perform dynamic
parameter autotuning; and if the load cannot be removed, you can perform static
autotuning.
3. Adjust the ACC/DEC time according to the actual operation conditions of the load.
4. Perform commissioning on the machine in jogging mode and check whether the rotating
direction of the motor meets the requirement. If no, exchange the wires of any two phases
of the motor to change the running direction of the motor.
5. Set all control parameters and then run the machine.