peak electricity  to charge the battery. 

The  charging  and  discharging  time  can  be  set 

exibly,  and  it  also 

allows to choose whether  charge from the grid or not. 

 

Work modes: 

Feed  in Priority

 

 

Priority:  load>grid>battery

 

This mode  applies  the area that has high feed-intariff  and export  control. 

 

The PV generated power will be used to supply the local loads 

firstly

, then 

export  to the public grid. The redundant  power  will charge the battery. 

 
 

Work modes: 

Back up mode

 

 

Priority:  battery>load>grid

 

This  mode  applies  the  area  that  has  frequentpower  outages.  And  this 

mode  ensures  the  battery  will  has  enough  energy  to  supply  when  the 

grid is o

ff

 . 

In this mode battery will be charging forcibly in the setting time and  
will  never  be  discharged  when  the  grid  is  on,  and  it  also  allows  

choose whether  charge from the grid or not. 

 

 
 

Back-up status

 

 

When the grid is o

ff

, system will supply emergency power from PV or 

battery to supply the home loads. (Battery is necessary in BACK-UP 

mode.) 

 

Содержание BD-RH1 Series

Страница 1: ...BD RH1 Series Hybrid Inverters User Manual...

Страница 2: ...RT DESCRIPTION 7 3 TECHNICAL PARAMETERS 8 4 INSTALLATION 9 4 1 CHECK FOR PHYSICAL DAMAGE 9 4 2 PACKING LIST 10 4 3 MOUNTING 10 5 ELECTRICAL CONNECTION 12 5 1 PVCONNECTION 12 5 2 GRID CONNECTION 13 5 3...

Страница 3: ...d from the PV panel before touching any inner live parts Keep dry The package product must be protected from excessive humidity and must be stored under cover Refer to the operating instructions Fragi...

Страница 4: ...e battery for future use or feed in to public grid Work mode depends on PV energy and user s preference It can provide power for emergency use during the grid lost by using the energy from battery and...

Страница 5: ...to supply the local loads firstly then to charge the battery The redundant power will export to the public grid Work modes Self use without PV Power When no PV supplied battery will discharge for loc...

Страница 6: ...lic grid The redundant power will charge the battery Work modes Back up mode Priority battery load grid This mode applies the area that has frequentpower outages And this mode ensures the battery will...

Страница 7: ...7 2 4 Dimension 2 5 Port Description Object Description A DC switch B PV1 PV4 input C Wifi GPRS D BAT input E BACK UP output F GRID G DRM BMS CT K DRY IO CAN USB...

Страница 8: ...leading 0 8lagging Output THDI 2 AC Output Data Back Up Nominal Apparent Power Output 6kVA 7 6kVA 9kVA 10KVA 11 4KVA Nominal Output Voltage 220V 240V Nominal Output Frequency 50Hz 60Hz Output THDU 2 P...

Страница 9: ...detection YES Output Over Voltage Protection YES Output Under Voltage Protection YES General Data Operating Temperature Range 25 60 C Relative Humidity 0 95 Operating Altitude 0 4000m Ingress Protecti...

Страница 10: ...rst The packing list shown as below Object Description A Inverter B Bracket C Expansion screws and pan head screws D Pin Terminal 3 sizes L M S E CT F Wifi module optional G GPRS module optional 4 3Mo...

Страница 11: ...t conditions below 1 Solid brick concrete or strength equivalent mounting surface 2 Inverter must be supported or strengthened if the wall s strength isn t enough such as wooden wall the wall covered...

Страница 12: ...ect PV modules with excellent function and reliable quality Open circuit voltage of module arrays connected in series should be Max DC input voltage operating voltage should be conformed to MPPT volta...

Страница 13: ...e into back of the male or female plug When you feel or heard a click sound the pin contact assembly is seated correctl 1 5 Plug the PV conntector into the corresponding PV connector on inverter Note...

Страница 14: ...board from all the phases and secure against re connection Step2 Grid cables choose Use the right pin terminal from the accessory box Press the connectors on cable conductor core tightly BD6KTL RH1 B...

Страница 15: ...ems not connected to the batteries the Back Up function is strongly not advised to use We shall not cover the standard warranty and be liable for any consequences arising from users not following this...

Страница 16: ...is appeared adjust the load power to make sure it is within the BACK UP output power range then turn the inverter back on For the nonlinear load please make sure the inrush power should be within the...

Страница 17: ...the 4 AWG wire and strip the cable to 15mm Select two O terminals with an aperture of M8 Insert the stripping line into the O terminal and clamp it with a crimping clamp Step2 Cross the battery cable...

Страница 18: ...2 must be disconnected Note The battery communication can only work when the battery BMS is compatible with the inverter Dry_IO RJ45 PIN Definition 1 2 3 4 5 6 7 8 DRYO_1A DRYO_1B X DRYI_1 DRYI_1B X X...

Страница 19: ...Plug purchase the product from supplier if needed so that the load mostly consumes PV energy and incurs the lowest possible energy costs during operation 1 Diagram 2 Connection 2 1 WIFI Connection St...

Страница 20: ...ellow The inverter is in warning Off The inverter has no Inverter Warning E Lit in red The inverter is in fault status Off The inverter has no errors F Function Button Esc Return from current interfac...

Страница 21: ...rid Press Esc button Select 1 Set up Press Enter button Press Enter button Press Enter button Note If local grid connection requires reactive power please set the required reactive power according to...

Страница 22: ...pressing Enter to exit the interface 2 Select the corresponding mode based on actual situation Self generation and self consumption system default mode Press password Press Enter button Press Enter b...

Страница 23: ...following contact information Name INVT Solar Technology Shenzhen Co Ltd Address 6th floor block A Invt Guangming Technology Building Kejie Four Road Matian Street Guangming Shenzhen China Zip Code 5...

Отзывы: