![inVENTer ZR10-D Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/inventer/zr10-d/zr10-d_installation-and-operating-instructions-manual_2083882034.webp)
34
ZR10-D controller
•
Installation and operating instructions
beWare
Incorrect positioning of the support ring.
Insertion of the blanking cover is not possible!
► Arrange locking hooks at the top and bottom.
► Locking hooks face out of the surface mounted box.
►
Attach support ring (18) with preassembled
ixing screws (17) on the right cavity.
►
Ensure that the locking hooks (19) face out of
the cabinet box.
►
Ensure that the locking hooks (19) are arranged
at the top and at the bottom.
►
Align the support ring (18) horizontally.
► Secure the support ring (18) with ixing screws (17)
on the cabinet box (20).
9
1
7
1
8
1
0
2
Ö
The transformer is now installed.
Installing the controller
Requirements:
Fan cable in place.
Transformer is installed.
Transformer cable connector and fan cable connector are installed.
►
Insert the 2-pin transformer connector (2) into
2-pin transformer socket (1).
►
Ensure that the 2-pin transformer socket (1) is
at the top.
►
Insert the 3-pin fan connector (3) into 3-pin
fan socket (4).
►
Turn the controller board (5) so that the cables
point backwards.
Ö
Cables point backwards.
2
3
4
5
1
►
Attach the controller board (6) with preassembled
ixing screws (8) on the cabinet box
►
Align the controller board (6) horizontally.
►
Secure the controller board (6) with
ixing screws (8) to the cabinet box (7).
6
7
8
assembly anD InsTallaTIon