![inVENTer ZR10-D Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/inventer/zr10-d/zr10-d_installation-and-operating-instructions-manual_2083882017.webp)
17
ZR10-D controller
•
Installation and operating instructions
making boreholes for surface mounted box
beWare
surface mounted box installed in false position.
Transformer of the ZR10-D controller can not be installed!
► Mount surface mounted box in vertical position.
Requirements:
Masonry must be dry and load-bearing.
Plasterboard is inished.
Avoid lintels when drilling boreholes.
►
Drill boreholes (Ø 8 mm) for rawl plugs on
interior wall.
►
Drill boreholes (Ø 12 mm) for power cable /
fan cable on interior wall.
12
72
19
8
Ö
Boreholes for surface mounted box are ready.
Making wall opening for the ZR distributor (optional)
noTe
A lush mounted box is delivered with the ZR distributor. The lush mounted box must be installed
additionally when using the ZR distributor. Observe the maximum distance of 1,30 m between the
controller and the ZR distributor.
Requirements:
Masonry must be dry and load-bearing.
Plasterboard is inished.
Avoid lintels when drilling wall opening.
► Fit a wall opening
(Ø
74 mm) f
or the lush
mounted box in the interior wall
.
Ø
74
Wall opening for ZR distributor is ready.
assembly anD InsTallaTIon