CHAPTER
18
Installation
18.1 Installing a Brand New OPT
In most cases a new installation must be done by the pump manufacturer, not a third party. Each pump
has safety certifications that can be invalidated if anyone other than the manufacturer modifies it.
Before a G6-300 can be installed, the pump enclosure must meet the following standards:
1.
Fire.
The enclosure must be designed to meet the requirements of ISO/EN 60950-1 for fire
enclosures.
2.
ATEX (Explosive Atmospheres).
The G6-300 has openings that prevent it being gas-tight. Because of this, it should be installed
away from all hazards. Refer to local laws and regulations for hazardous zones to work out the
best mounting place for the G6-300. The pump or cabinet that the G6-300 is mounted in should
also be designed to prevent a dangerous build-up of explosive gases.
3.
Security.
The pump or cabinet should offer physical security to protect the public from the hazards within,
and to reduce the ability of anyone to tamper with the OPT.
4.
Power & Data.
a. The pump or cabinet must provide mains power. The requirements are:
i. A permanently-wired connection or a socket to plug it into.
ii. A protective earth connection.
iii. The outlet
may
be switched if it is a socket, and
must
be switched if it is permanently
wired.
iv. We recommend one Power Supply Unit (PSU) per G6-300. The use of two G6-300s on
a single PSU may lead to erratic start up behaviour and is not recommended. If using
two G6-300s to one PSU, both must have power applied at the same time to reduce this
risk.
b. The pump or cabinet must provide an Ethernet data connection. The requirements are:
v. Capable of at least 10Mbps (preferably 100Mbps).
DCV-00477 S2 R03
22
Содержание G6-300
Страница 20: ...CHAPTER 15 Product Features 15 1 Location of Features Fig 15 1 G6 300 Front Features DCV 00477 S2 R03 17 ...
Страница 21: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 15 2 G6 300 Rear Features Chapter 15 Product Features 18 ...
Страница 30: ...CHAPTER 20 Installing Into a New Pump or Cabinet Fig 20 1 Installing a New G6 300 DCV 00477 S2 R03 27 ...
Страница 41: ...CHAPTER 30 Standard Screens Start up screen Fig 30 1 G6 300 Start up screen DCV 00477 S2 R03 38 ...
Страница 45: ...CHAPTER 32 How to Load Paper DCV 00477 S2 R03 42 ...
Страница 46: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 32 1 How to Load Paper Chapter 32 How to Load Paper 43 ...
Страница 53: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 3 Card slot insertion light Chapter 35 Inspection 50 ...
Страница 54: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 4 Left hand close up of card slot Chapter 35 Inspection 51 ...
Страница 55: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 5 Right hand close up of card slot Chapter 35 Inspection 52 ...
Страница 59: ...CHAPTER 38 Drawings 38 1 Dimensions Fig 38 1 G6 300 Front Dimensions DCV 00477 S2 R03 56 ...
Страница 60: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 38 2 G6 300 Side Dimensions Chapter 38 Drawings 57 ...
Страница 65: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 40 1 Typical G6 300 wiring Chapter 40 Typical Wiring 62 ...