G6-300 Installation Guide, DCV-00477 S2 R03
vi. The connection must be either a socket into which a standard Ethernet patch cable can
be connected, or a cable that is terminated in a standard RJ45 plug suitable for direct
connection into the OPT LAN socket.
vii. Minimum cable standard should be Cat5e.
c. The enclosure may provide an alternative data connection for terminals that have optional
communications modules installed.
Please consult with Invenco for what options are
available.
5.
Accessibility.
The enclosure must be designed and mounted so that disabled persons are able to operate the
OPT. Height must be compliant with PCI 5.0 standards. The G6-300 has an optional ADA keypad
that can be purchased and installed if required in order to meet this compliance.
6.
Materials.
The enclosure and all its components must be constructed of durable materials suitable for the
intended location.
7.
Door cut-out.
d. Use the wireframe
at the end of this manual to determine the extra space
required for the front of the terminal (the terminal is larger than cut-out).
e. The edge of the cut-outs should be smooth and free of burrs, and the surface of the door
around the cut-out should be clean, and planar within
±
1mm.
8.
Water-Tightness.
The G6-300 is rated for IP24 on its external parts.
The parts sitting inside the pump/pedestal enclosure are designed to reduce the likelihood of rain
splashes entering the electronics but the enclosure must provide good protection from water.
The door should have a water seal against the enclosure, and there should be good drainage
and/or a system to reduce excessive condensation build-up and dripping.
9.
Protection from Weather Extremes.
| While the G6-300 is intended for use outdoors, exposure
to direct sunlight and/or heavy rain can affect customers’ experience using the product. | The
pump or enclosure should provide a canopy that prevents the OPT from being exposed to direct
sunlight and heavy rain. | If the OPT cannot be protected from direct sunlight, a warning sign
should be provided close to the OPT advising that the screen may become too hot to touch.
10.
Placement.
The G6-300 must always be installed in an upright (vertical) position with no horizontal tilt.
11.
Hinging.
Use the following diagrams as a guide when designing an enclosure and/or door to house the
G6-300. This will ensure there is a clearance between the G6-300 housing and the opening.
Note:
Invenco Recommends
Right-side hinging only
. Hinging on the left side may cause
cables to be pulled out.
Chapter 18. Installation
23
Содержание G6-300
Страница 20: ...CHAPTER 15 Product Features 15 1 Location of Features Fig 15 1 G6 300 Front Features DCV 00477 S2 R03 17 ...
Страница 21: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 15 2 G6 300 Rear Features Chapter 15 Product Features 18 ...
Страница 30: ...CHAPTER 20 Installing Into a New Pump or Cabinet Fig 20 1 Installing a New G6 300 DCV 00477 S2 R03 27 ...
Страница 41: ...CHAPTER 30 Standard Screens Start up screen Fig 30 1 G6 300 Start up screen DCV 00477 S2 R03 38 ...
Страница 45: ...CHAPTER 32 How to Load Paper DCV 00477 S2 R03 42 ...
Страница 46: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 32 1 How to Load Paper Chapter 32 How to Load Paper 43 ...
Страница 53: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 3 Card slot insertion light Chapter 35 Inspection 50 ...
Страница 54: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 4 Left hand close up of card slot Chapter 35 Inspection 51 ...
Страница 55: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 35 5 Right hand close up of card slot Chapter 35 Inspection 52 ...
Страница 59: ...CHAPTER 38 Drawings 38 1 Dimensions Fig 38 1 G6 300 Front Dimensions DCV 00477 S2 R03 56 ...
Страница 60: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 38 2 G6 300 Side Dimensions Chapter 38 Drawings 57 ...
Страница 65: ...G6 300 Installation Guide DCV 00477 S2 R03 Fig 40 1 Typical G6 300 wiring Chapter 40 Typical Wiring 62 ...