SECTION 13—CONTROL PANEL
55
Perfecto
2
™
15. Run unit and check for leaks at pressure sensor tubing on product tank cap. Refer to
16. Reinstall cabinet. Refer to Removing Cabinet on page 23.
FIGURE 13.1
Circuit Breaker
(STEP 9)
Hour Meter
(STEP 9)
On/Off Switch
(STEP 9)
Mounting
Screws
Control Panel
DETAIL “A”
Tie
Wrap
Tie
Wrap
Control
Panel
DETAIL “B”
¼ Tubing
(STEP 6)
¼ Tubing (STEP 7)
Mounting Screws
(STEP 5)
Control Panel
P.C. Board