9
XS2-IM Rev. 10/14 (SBK-XS2 INSTALL)
2”
2 1/2”
I N S T A L L A T I O N M A N U A L
X - S T R E A M 2 ™ S L I D E
STEP ONE: Attach the Step Assembly to the Entry Section
Thread the flex PVC hose from the entry section through the step tube assembly and out
the pre-drilled hole above the bottom step. (See Fig. 1) Utilizing hardware kit XS-103-SS,
attach the step assembly to the entry section on the ground. Be careful not to scratch the
slide; use the cardboard box the slide arrived in for protection. Insert the top of the ladder
into the ladder receiver on the entry section and align the holes. (See Fig. 2) Place a 3/8”
flat washer over a 3/8” x 7-1/2” bolt; then 3/8” flat washer then push bolt through the
pre-drilled holes in the PVC step assembly all the way through and out the opposite side. Hand
tighten only. (These will be tightened after attachment to flume/exit section.
Fig. 2: Ladder Step Support Sub-Assembly
STEP TWO: Attach the Handrails to the Ladder and Entry Section
TIP: Install the handrails as shown in figure below.
TIP: Hand tighten the all-threads into the handrails only, do not use any mechanical means
such as a wrench or pliers to tighten the all-threads.
TIP: There are 7 all-threads utilized on each handrail. There are 2 different lengths of all-
threads used on each handrail. (See Fig. 3 to match actual size.) (XS2-105-SS Kit)
TIP: The offset at the bottom of each handrail faces in as the step attachment point is nar-
rower than the entry section.
Fig. 3
Fig. 4: Back View of Ladder Section Assembly