I N S T A L L A T I O N M A N U A L
X - S T R E A M 2 ™ S L I D E
12
XS2-IM Rev. 10/14 (SBK-XS2 INSTALL)
STEP THREE: Attach the Foot Pedestals to the Legs
TIP: Both PVC legs have a different hole drill pattern at each end. There is a top/bottom
orientation. The offset bolt holes go to the top and bolt to the flumes. (See Fig. 9)
Insert one end of the long PVC leg onto the foot pedestal, align the holes, utilizing hardware kit
XS-101-SS, place a flat washer over a 3/8” bolt; then push bolt through the pre-drilled holes
in the PVC leg and the foot pedestal, then place flat washer then 3/8” nylon nut and tight-
en. Repeat the process for the short PVC leg.
STEP FOUR: Assemble the Flume Sections
TIP: Assemble the flume sections on the ground. Be careful not to scratch the slide; use
the cardboard box for protection. Hand tighten the flume bolts for now, they will be fully
tightened once the flume is correctly aligned.
Right Turn or Left Turn Assembly:
The flumes are labeled A–B or C–D in small letters on the flanges without the gaskets.
To assemble a Left Turn slide: flume A–B will be the upper flume and C–D will be the lower
flume, assembled in that order.
To assemble a Right Turn slide: flume C–D will be the upper flume and A–B will be the lower
flume, assembled in that order.
TIP: There are 3 factory installed gaskets. Ensure that a gasket is in place on the entry
section, and the “B” end of the A–B flume and the “D” end of the C–D flume.
Utilizing hardware kit XS2-102-SS, attach the lower flume to the upper flume. Align the five
holes in the flange, push 3/8” bolt through a flat washer, then through the pre-drilled holes
in the flanges, then push bolt through a flat washer, then a lock washer and through a 3/8”
nut. Hand tighten at this time.
Fig. 9