I N S T A L L A T I O N M A N U A L A D R E N A L I N E ™ S L I D E
16
ADR1-IM Rev. 4/16 (ADR-INSTALL)
STEP EIGHT: Anchoring the Slide to the Deck - CONT.
Position the entry-step assembly about 12” from the upper flume. While holding the vinyl
tubing from the exit cut the tubing off about 1” back from the red cap. Holding the tubing
will insure that it doesn’t fall back into the upper flume section. Connect the tubing to the
coupler and push any excess tubing back into the flume section. Be careful not to kink the
tubing or get it caught between connection flanges as the parts are bolted together.
Carefully lift and place the Entry and Ladder section over the anchor bolts. Align the 5 flange
holes between the entry and the upper flume, and repeat the bolting instructions.
Hand
tighten for now.
Place a 3/8” flat washer (hardware kit ADR-104-SS), a lock washer and a nut over the
anchor bolts and carefully tighten the nuts to secure the slide to the deck.
STEP NINE: Alignment of Flume Sections
Gently position the assembled slide into its correct and final position on the pool deck, align the
sliding surface by adjusting the flume to flume alignment. (See Fig. 23)
TIP: There is enough tolerance in the flange connections to provide a smooth and even transition
of the sliding surface between the flume sections.
TIP: Once the flume sections are bolted together hand tight, then gently push or pull on the
flume sections to ensure a smooth, even alignment of the sliding surface.
Starting with the exit section, tighten the two outer bolts in an alternating fashion while main-
taining a smooth sliding surface. Repeat this process for the other flanges as you move up
the slide. Tighten all flange to flange connection bolts at this time.
Fig. 23