I N S T A L L A T I O N M A N U A L A D R E N A L I N E ™ S L I D E
12
ADR1-IM Rev. 4/16 (ADR-INSTALL)
STEP FOUR: Attach the Legs to the Flume
Insert the top of the long leg into leg receiver of the upper flume, and the top of the short leg
into the leg receiver of the lower flume. Align holes, then utilizing hardware kit ADR-103-SS
and anti-seize, place a 3/8” flat washer over a 3/8”x9-1/2” bolt, then push bolt completely
through the pre-drilled holes in the leg receiver and PVC leg then place a 3/8” flat washer
then a lock washer and a nut. Hand tighten only at this time, these will be tightened after
the flume is aligned. (See Fig. 12 & Fig. 13)
NOTE: Install the 3/8” x 9-1/2” bolts through the holes from the higher side of the flume,
pushing them through toward the exit of the slide.
Fig. 12
Fig. 13
STEP FIVE: Assemble the Flume Sections
TIP: Hand tighten the flume bolts for now (be sure to apply anti-seize on bolts), they will be fully
tightened once the flume is correctly aligned.
TIP: There are 3 factory installed gaskets. Ensure that a gasket is in place on the entry section,
the upper flume and the lower flume.
Start the flume assembly by placing the exit section upright on its front pedestal as close
as possible to its final position on the pool deck. Next, turn the lower flume upright on its
pedestal.
With exit section in its approximate final position, place the lower flume with leg and pedestal
about 12” from the exit. Use the hook in the end of the fish wire to connect to the hole in
the end of the red cap on vinyl tubing. Bend the end of the wire to close the hook as shown
in Figure 14. Gently pull the vinyl tubing through the flume section with the fish wire. Pull all
tubing through and be careful not to kink the tubing or get it caught between connection
flanges as the parts are bolted together.
Fig. 14
RED CAP