background image

 

1.5 

Warranty 

 

Intenda’s products are guaranteed as by law, with effect from the date stated on the invoice. 
 
During  this  period  INTENDA  S.r.l.  will  remove  in  an  appropriate  time  all  vices  and  defects  of  the 
materials and/or of the building process, only if the box: 

  has been installed by qualified workers 

  has been used correctly, following the conduct and maintenance indications contained in this 

manual 

  has not been subjected to natural disasters 

 
 
To remove the defects found out during the warranty time: 

  the costs of working time and transport are at the expense of the dealer 

  the costs of spare parts are at the expense of INTENDA S.r.l. 

 
 
Warranty is meant to be ex works Legnago (VR). All the tools and optional parts eventually supplied 
by the dealer are not subject to the warranty. 
In the box building process INTENDA S.r.l. uses materials and mechanisms of suitable type, state 
and  quality,  at  its  own  discretion;  even  after  the  receipt  of  the  order,  INTENDA  S.r.l.  can  make 
substantial changes or appropriate improvements at its own discretion. 
Slight  colour  differences,  folds  or  “partridge’s  eyes”  in  the  PVC  clothes  should  not  be  considered 
defects, but features of the article. 
 
 
 

2.

  BOX DESCRIPTION AND TECHNICAL SHEET

 

 

2.1 General description 

 

The box must be used only as an ordinary protection cover, for purely temporary use. In case of bad 
weather conditions (wind, snow), the box must be removed. Given that the box cannot be fixed to 
the  ground  -  but  only  bound  to  it  -  its  use  in  these  conditions  can  cause  damages  to  people  and 
things. 
It is particularly important for safety not to hang or apply any type of load at the structure or at the 
top cover of the box.  
In  particular,  children  must  not  handle  the  snails.  The  failure  to  respect  the  conditions  of  use  and 
warnings immediately voids the warranty. 

 

 

 

 

 

 

Содержание KIT BOX SERRA

Страница 1: ...INSTALLATION USE AND MAINTENANCE KIT BOX SERRA INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info intenda it...

Страница 2: ...BOX DESCRIPTION AND TECHNICAL SHEET 6 2 1 General description 6 2 2 Components 7 2 3 Fabric s characteristics 9 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the insta...

Страница 3: ...ranslations into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only because it is...

Страница 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Страница 5: ...nufacturer as a means of product identification For no reason the data shown on the product can be altered A reproduction of the plate is shown in the following drawing Notes contain important informa...

Страница 6: ...ilding process INTENDA S r l uses materials and mechanisms of suitable type state and quality at its own discretion even after the receipt of the order INTENDA S r l can make substantial changes or ap...

Страница 7: ...th joints 2 VINITEX TARPAULINS 3 VINITEX PVC GABLE END 4 PVC SLIDING CURTAIN 5 ALUMINIUM CROSSBEAM 6 NYLON ROUND BUTTON 7 ELASTIC ROPE 8 GROUND FIXING BRACKETS 9 CROSSES CM 160X160 10 BARS FOR TIGHTEN...

Страница 8: ...8...

Страница 9: ...arp 2 yarns cm Weft 2 yarns cm Thickness 0 46 mm Weight ca 350 g m2 ISO 2286 2 Finishing translucent PVC film with polyester support Breaking Strength Warp ca 90 DaN 5 cm EN ISO 1421 Weft ca 75 DaN 5...

Страница 10: ...ration is made by hand it is important to consider that the weight limit that each male person can handle is 25 kg moreover the operators should be equipped with gloves and safety shoes 3 2 Place and...

Страница 11: ...xisting environmental norms 3 3 2 Box installation The box should be installed according to the following instructions The uprights must be lifted up an opened up slightly photo 3 Put the two arches w...

Страница 12: ...e other profiles photo 6 7 8 9 Now insert the top covers in the profiles like demonstrated in photos 10 to 19 In order to facilitate this procedure it is advised to spray lubricant into the grooves ph...

Страница 13: ...13 PHOTO 12 PHOTO 13 PHOTO 17 PHOTO 16 PHOTO 19 PHOTO 14 PHOTO 15 PHOTO 18...

Страница 14: ...edure for all top covers The top covers must be fixed with screws to the lower part of the structure photo 21 22 Proceed to the installation of the two sliding curtains photo 23 24 25 PHOTO 18 PHOTO 2...

Страница 15: ...30 NOTICE for the Base Version the two supplied ratchets must be used for tensioning the crosses photo 28 29 30 for the Mobile Version ratchets are already installed on every cross The number of the r...

Страница 16: ...le module at both sides stop the plates placed at the bottom part of the crosses using the matching screws photo 31 and 32 PHOTO 30 PHOTO 29 PHOTO 28 PHOTO 31 PHOTO 32 PHOTO 27 PHOTO 26 PHOTO 28 PHOTO...

Страница 17: ...und i twill be possible to measure the Box length and to cut the metal bar in the same length as the Box length Then make a hole where the bar must be fixed to the arch In the end the bar must be fast...

Страница 18: ...d in this manual It is useful to explain the correct meaning of some terms used it this manual Dangerous areas any part of the box which can damage a person during handling of the structure Exposed pe...

Страница 19: ...between the crosses in horizontal position Link the internal stretching devices to the pegs with eyelet placed on the ground then put in tension the structure through the stretching device The structu...

Страница 20: ...evere maintenance deficiencies in case of unauthorized modifications of the product with total or partial non compliance with the instructions It is not possible to use the box in conditions of strong...

Страница 21: ...es Ordinary maintenance checks and lubrification operations must be done after the frame has been uninstalled ATTENTION Every modification or manomission which has not been previously authorized by th...

Страница 22: ...EVERY 24 MONTHS General inspection of the constructor with report of the most stressed components 7 DISASSEMBLY Disassembling operations are done backward to the assembly The eventual disposal of the...

Отзывы: