Scrupulously perform the following operations: 

 

EVERY DAY: 

Before the use, visually inspect the box, paying particular attention to eventual breakages 

Check the PVC awning integrity 

EVERY WEEK: 

Lubricate the sliders (mobile version) 

EVERY 6 MONTHS

Check  the  general  condition  of  the  structure;  if  necessary,  substitute  the  usured  or  damaged 

components. Always use original spare parts. 

Check all the screws 

Check the ground-fixing systems. 

EVERY 24 MONTHS: 

General inspection of the constructor, with report of the most stressed components.  

 

 

7. DISASSEMBLY 

 

Disassembling operations are done backward to the assembly.  
The  eventual  disposal  of  the  box  must  be  made  in  accordance  with  the  existing  environmental 
norms. 
 

ATTENTION 

Respect laws about use and disposal of the cleaning and handling products in force in the country 

where the structure is used. Respect also the manufacturer’s provisions. 

 

We evaluate a product life duration of 10 years. After this period of time, it is necessary to have a 

check from an Intenda S.r.l. technician, who will analyze the remaining life period.  

 

 

Содержание KIT BOX SERRA

Страница 1: ...INSTALLATION USE AND MAINTENANCE KIT BOX SERRA INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info intenda it...

Страница 2: ...BOX DESCRIPTION AND TECHNICAL SHEET 6 2 1 General description 6 2 2 Components 7 2 3 Fabric s characteristics 9 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the insta...

Страница 3: ...ranslations into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only because it is...

Страница 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Страница 5: ...nufacturer as a means of product identification For no reason the data shown on the product can be altered A reproduction of the plate is shown in the following drawing Notes contain important informa...

Страница 6: ...ilding process INTENDA S r l uses materials and mechanisms of suitable type state and quality at its own discretion even after the receipt of the order INTENDA S r l can make substantial changes or ap...

Страница 7: ...th joints 2 VINITEX TARPAULINS 3 VINITEX PVC GABLE END 4 PVC SLIDING CURTAIN 5 ALUMINIUM CROSSBEAM 6 NYLON ROUND BUTTON 7 ELASTIC ROPE 8 GROUND FIXING BRACKETS 9 CROSSES CM 160X160 10 BARS FOR TIGHTEN...

Страница 8: ...8...

Страница 9: ...arp 2 yarns cm Weft 2 yarns cm Thickness 0 46 mm Weight ca 350 g m2 ISO 2286 2 Finishing translucent PVC film with polyester support Breaking Strength Warp ca 90 DaN 5 cm EN ISO 1421 Weft ca 75 DaN 5...

Страница 10: ...ration is made by hand it is important to consider that the weight limit that each male person can handle is 25 kg moreover the operators should be equipped with gloves and safety shoes 3 2 Place and...

Страница 11: ...xisting environmental norms 3 3 2 Box installation The box should be installed according to the following instructions The uprights must be lifted up an opened up slightly photo 3 Put the two arches w...

Страница 12: ...e other profiles photo 6 7 8 9 Now insert the top covers in the profiles like demonstrated in photos 10 to 19 In order to facilitate this procedure it is advised to spray lubricant into the grooves ph...

Страница 13: ...13 PHOTO 12 PHOTO 13 PHOTO 17 PHOTO 16 PHOTO 19 PHOTO 14 PHOTO 15 PHOTO 18...

Страница 14: ...edure for all top covers The top covers must be fixed with screws to the lower part of the structure photo 21 22 Proceed to the installation of the two sliding curtains photo 23 24 25 PHOTO 18 PHOTO 2...

Страница 15: ...30 NOTICE for the Base Version the two supplied ratchets must be used for tensioning the crosses photo 28 29 30 for the Mobile Version ratchets are already installed on every cross The number of the r...

Страница 16: ...le module at both sides stop the plates placed at the bottom part of the crosses using the matching screws photo 31 and 32 PHOTO 30 PHOTO 29 PHOTO 28 PHOTO 31 PHOTO 32 PHOTO 27 PHOTO 26 PHOTO 28 PHOTO...

Страница 17: ...und i twill be possible to measure the Box length and to cut the metal bar in the same length as the Box length Then make a hole where the bar must be fixed to the arch In the end the bar must be fast...

Страница 18: ...d in this manual It is useful to explain the correct meaning of some terms used it this manual Dangerous areas any part of the box which can damage a person during handling of the structure Exposed pe...

Страница 19: ...between the crosses in horizontal position Link the internal stretching devices to the pegs with eyelet placed on the ground then put in tension the structure through the stretching device The structu...

Страница 20: ...evere maintenance deficiencies in case of unauthorized modifications of the product with total or partial non compliance with the instructions It is not possible to use the box in conditions of strong...

Страница 21: ...es Ordinary maintenance checks and lubrification operations must be done after the frame has been uninstalled ATTENTION Every modification or manomission which has not been previously authorized by th...

Страница 22: ...EVERY 24 MONTHS General inspection of the constructor with report of the most stressed components 7 DISASSEMBLY Disassembling operations are done backward to the assembly The eventual disposal of the...

Отзывы: