CLOSURE OF THE STRUCTURE: 
 

-

 

Unlock the tension bar placed between the crosses 

-

 

Push the frame until its complete closure  

 

a.     Not allowed uses 

 

The product should be used for the purposes declared by the constructor. 

In particular, the box must not be used: 

without PVC awnings 

with missing/broken safety and fixing devices 

in explosive atmosphere, or in place with potential fire hazard 

to contain materials with non-conforming measures, or materials which protrude from the 
structure 

in  adverse  weather  conditions;  in  these  situations  (strong  wind,  rain,  snow),  it  is 
necessary to fold up the box  

in dangerous conditions, if the structure appears damaged or not functioning 

for unproper uses and/or by unskilled people 

for purposes which are contrary to the norms 

in case of severe maintenance deficiencies 

in case of unauthorized modifications of the product 

with total or partial non-compliance with the instructions 

 

It is not possible to use the box in conditions of strong wind and/or snow. 

In order to use the product during these adverse conditions, a written declaration by 
Intenda is needed. 

Every  modification  of  the  product  which  changes  the  functionalities  of  the  box  and 
subsequently modify the risks, have not been authorized by the constructor. 

These  kinds  of  changes,  if  not  authorized  by  the  constructor,  will  cause  the  decay  the 
warranty and will invalid the declaration of conformity of the product. 

 

b.     Residual risks 

 

According to its own knowledge of the product, the constructor declares that the following dangers 
may occur: 

Unusual vibrations of the structure 

Cutting, shearing, hitting of the operator by the mobile components during the handling of 
the box 

Slipping or trippling of the operator during the installation process 

Содержание KIT BOX SERRA

Страница 1: ...INSTALLATION USE AND MAINTENANCE KIT BOX SERRA INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info intenda it...

Страница 2: ...BOX DESCRIPTION AND TECHNICAL SHEET 6 2 1 General description 6 2 2 Components 7 2 3 Fabric s characteristics 9 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the insta...

Страница 3: ...ranslations into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only because it is...

Страница 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Страница 5: ...nufacturer as a means of product identification For no reason the data shown on the product can be altered A reproduction of the plate is shown in the following drawing Notes contain important informa...

Страница 6: ...ilding process INTENDA S r l uses materials and mechanisms of suitable type state and quality at its own discretion even after the receipt of the order INTENDA S r l can make substantial changes or ap...

Страница 7: ...th joints 2 VINITEX TARPAULINS 3 VINITEX PVC GABLE END 4 PVC SLIDING CURTAIN 5 ALUMINIUM CROSSBEAM 6 NYLON ROUND BUTTON 7 ELASTIC ROPE 8 GROUND FIXING BRACKETS 9 CROSSES CM 160X160 10 BARS FOR TIGHTEN...

Страница 8: ...8...

Страница 9: ...arp 2 yarns cm Weft 2 yarns cm Thickness 0 46 mm Weight ca 350 g m2 ISO 2286 2 Finishing translucent PVC film with polyester support Breaking Strength Warp ca 90 DaN 5 cm EN ISO 1421 Weft ca 75 DaN 5...

Страница 10: ...ration is made by hand it is important to consider that the weight limit that each male person can handle is 25 kg moreover the operators should be equipped with gloves and safety shoes 3 2 Place and...

Страница 11: ...xisting environmental norms 3 3 2 Box installation The box should be installed according to the following instructions The uprights must be lifted up an opened up slightly photo 3 Put the two arches w...

Страница 12: ...e other profiles photo 6 7 8 9 Now insert the top covers in the profiles like demonstrated in photos 10 to 19 In order to facilitate this procedure it is advised to spray lubricant into the grooves ph...

Страница 13: ...13 PHOTO 12 PHOTO 13 PHOTO 17 PHOTO 16 PHOTO 19 PHOTO 14 PHOTO 15 PHOTO 18...

Страница 14: ...edure for all top covers The top covers must be fixed with screws to the lower part of the structure photo 21 22 Proceed to the installation of the two sliding curtains photo 23 24 25 PHOTO 18 PHOTO 2...

Страница 15: ...30 NOTICE for the Base Version the two supplied ratchets must be used for tensioning the crosses photo 28 29 30 for the Mobile Version ratchets are already installed on every cross The number of the r...

Страница 16: ...le module at both sides stop the plates placed at the bottom part of the crosses using the matching screws photo 31 and 32 PHOTO 30 PHOTO 29 PHOTO 28 PHOTO 31 PHOTO 32 PHOTO 27 PHOTO 26 PHOTO 28 PHOTO...

Страница 17: ...und i twill be possible to measure the Box length and to cut the metal bar in the same length as the Box length Then make a hole where the bar must be fixed to the arch In the end the bar must be fast...

Страница 18: ...d in this manual It is useful to explain the correct meaning of some terms used it this manual Dangerous areas any part of the box which can damage a person during handling of the structure Exposed pe...

Страница 19: ...between the crosses in horizontal position Link the internal stretching devices to the pegs with eyelet placed on the ground then put in tension the structure through the stretching device The structu...

Страница 20: ...evere maintenance deficiencies in case of unauthorized modifications of the product with total or partial non compliance with the instructions It is not possible to use the box in conditions of strong...

Страница 21: ...es Ordinary maintenance checks and lubrification operations must be done after the frame has been uninstalled ATTENTION Every modification or manomission which has not been previously authorized by th...

Страница 22: ...EVERY 24 MONTHS General inspection of the constructor with report of the most stressed components 7 DISASSEMBLY Disassembling operations are done backward to the assembly The eventual disposal of the...

Отзывы: