JBOD2000S3SP Hardware Guide
ii
Revision History
Date
Revision
Number
Modifications
November 2014
0.9
Pre-production release.
December 2014
1.0
Production version release.
May 2015
1.1
Removed references to PSU Cold Redundancy support.
October 2015
1.2
Added optional PSU and power cable references in the Power Subsystem
section.
March 2016
1.3
Converted to the new format.
Содержание JBOD2312S3SP
Страница 2: ... This page is intentionally left blank ...
Страница 3: ......
Страница 10: ...Intel Storage Server System JBOD2312S3SP Hardware Guide viii This page intentionally left blank ...
Страница 13: ...Intel Storage Server System JBOD2312S3SP Hardware Guide 3 2 1 Chassis Dimensions Figure 2 Chassis Dimensions ...