Independent Loading Mechanism (ILM)
32
Thermal/Mechanical Specifications and Design Guide
The ILM opening sequence is shown in
1. Open hinge lever
2. Open active lever
Note:
The opening sequence is also marked on the ILM load plate
3. Open the load plate by pushing down on the hinge lever
, this will cause
the load plate tab to rise above the socket. Grasp the tab, only after it has risen
away from the socket, open load plate to full open position.
Note:
ILM cover not shown for clarity.
Figure 4-6. Opening ILM
Opening the hinge lever
provides the clearance to
open the active lever
Step 1
Open Hinge Lever
Step 2
Open Active Lever
Figure 4-7. Opening Sequence for ILM and Loadplate (cont.)
Содержание BX80619I73820
Страница 10: ...10 Thermal Mechanical Specifications and Design Guide...
Страница 14: ...Introduction 14 Thermal Mechanical Specifications and Design Guide...
Страница 104: ...Thermal Solutions 104 Thermal Mechanical Specifications and Design Guide...
Страница 112: ...Mechanical Drawings 112 Thermal Mechanical Specifications and Design Guide...
Страница 118: ...Socket Mechanical Drawings 118 Thermal Mechanical Specifications and Design Guide...
Страница 124: ...Package Mechanical Drawings 124 Thermal Mechanical Specifications and Design Guide...