![Instrumentation GDD GRx8mini Скачать руководство пользователя страница 132](http://html1.mh-extra.com/html/instrumentation-gdd/grx8mini/grx8mini_instruction-manual_2070186132.webp)
Instrumentation GDD Inc. 2018-04-06
Page 132
As shown on the images on the previous page, this setup is for 2 lines of 16 dipoles each using a
GDD Rx-32. For the reference pins, R1 and R3 will be used; R2 and R4 will not be used since this is
a 2 lines setup.
1)
Select the Pole-Dipole 2/16 on the Setup tab.
2)
On the Position tab; enter the parameters of your survey.
Содержание GRx8mini
Страница 7: ...Instrumentation GDD Inc 2018 04 06 Page 7 A B C D F G H I J K L M optional N O P Q E...
Страница 63: ...Instrumentation GDD Inc 2018 04 06 Page 63 2 If you want to verify the GPS time select Check GPS...
Страница 83: ...Instrumentation GDD Inc 2018 04 06 Page 83 4 The Allegro2 can now be accessed from the Windows File Explorer...
Страница 101: ...Instrumentation GDD Inc 2018 04 06 Page 101...
Страница 102: ...Instrumentation GDD Inc 2018 04 06 Page 102...
Страница 104: ...Instrumentation GDD Inc 2018 04 06 Page 104...
Страница 131: ...Instrumentation GDD Inc 2018 04 06 Page 131 3D Survey Pole Dipole 2 16...
Страница 138: ...Instrumentation GDD Inc 2018 04 06 Page 138 5 Your next setup on the field should be like this...