![Instrumentation GDD GRx8mini Скачать руководство пользователя страница 128](http://html1.mh-extra.com/html/instrumentation-gdd/grx8mini/grx8mini_instruction-manual_2070186128.webp)
Instrumentation GDD Inc. 2018-04-06
Page 128
2)
Enter the positions corresponding to your survey parameters.
3)
If all the values are correct, click the Ok button to continue and take a reading. If something is
incorrect, you can modify it on this page.
4)
For a Wenner survey, you will have to manually enter the parameters for each reading. To
access the Position page, click the Tools button and select the Config option in the pop-up
menu.
Содержание GRx8mini
Страница 7: ...Instrumentation GDD Inc 2018 04 06 Page 7 A B C D F G H I J K L M optional N O P Q E...
Страница 63: ...Instrumentation GDD Inc 2018 04 06 Page 63 2 If you want to verify the GPS time select Check GPS...
Страница 83: ...Instrumentation GDD Inc 2018 04 06 Page 83 4 The Allegro2 can now be accessed from the Windows File Explorer...
Страница 101: ...Instrumentation GDD Inc 2018 04 06 Page 101...
Страница 102: ...Instrumentation GDD Inc 2018 04 06 Page 102...
Страница 104: ...Instrumentation GDD Inc 2018 04 06 Page 104...
Страница 131: ...Instrumentation GDD Inc 2018 04 06 Page 131 3D Survey Pole Dipole 2 16...
Страница 138: ...Instrumentation GDD Inc 2018 04 06 Page 138 5 Your next setup on the field should be like this...