background image

Environmental (Information 
On Disposal For Users 
Of Waste Electrical & 
Electronic Equipment)

The “crossed out wheelie bin” symbol on 

this product means that discarded electrical 

and electronic products should not be mixed 

with general waste. Disposing of the product 

correctly will help to save valuable resources 

and prevent any potential negative effects 

on human health and the environment which 

could otherwise arise from inappropriate 

waste handling. For proper treatment, 

recovery and recycling of end-of-life products, 

please contact your dealer or supplier for further 

information, or local authority for details of your 

nearest designated collection point.

Delivery Checklist

Before starting installation, check that you have 

the following parts;
•  Catering Water Boiler
•  Drip-tray
•  Drip-tray fitting kit
•  White water inlet hose (3/4”BSP connection)
•  User instructions

Technical Specification

Model

1501F 3001F

Width

mm

252

310

Depth

mm

518

518

Height

mm

610

618

Power Rating

KW

3.0

3.0

Weight (Empty)

KG

13.5

15.5

Weight (Full)

KG

28

36

Water Inlet Pressure: Bar

2 to 7 2 to 7

Installation

The boiler must be installed on a level work 

surface with sufficient strength to support 

its weight. Ensure all vents are unobstructed.
Locate in an area where there is adequate space 

to use the boiler safely (e.g. free from risk of 

congestion and tripping hazards).

Connection to Mains Water Supply:

Connect the WRAS approved water filling hose 

(3/4”BSP) to the inlet connection point on the 

back of the boiler and the other end to the mains 

water supply, via an accessible isolating tap with 

a ¾”BSP thread*.

IMPORTANT:

 If micro-bore pipe is used instead 

of the inlet hose supplied, the size must be 

minimum OD 3/8”(10mm).
The water supply must have a pressure not 

exceeding 7bar (96psi), and no lower than 2bar 

(20psi) NOTE: If your water pressure exceeds 

7bar, fit a suitable pressure reduction valve.

We regret that Instanta cannot be held 
responsible for any machine malfunctions if 
the water pressure exceeds that stated. If in 
doubt, consult your water supply company.

*To meet WRAS installation requirements, an 

approved single-check valve providing back-

flow prevention protection, should be fitted 

at the point of connection between the water 

supply and the appliances.

Electrical Connection:

The boiler must be Earthed.
Your machine is supplied with a standard 13amp 

bonded plug with a 13amp fuse.

Overflow:

The drip-tray has a limited capacity and is 

designed to handle small spillages and drips. 

Wherever possible, we strongly recommend 

that it is connected to a permanent waste outlet 

using the fitting kit provided.
If preferred, and as an alternative, the 

overflow can be connected from the back of 

the machine using an optional rear-overflow 

kit (Pt. No: ROFK1) available from Instanta 

Spares Department (01704 502905).

IMPORTANT:

 Whichever overflow connection is 

chosen, the diameter of the pipe used must be 

no less than 15mm.
Failure to connect the overflow-outlet to a 

permanent waste of drain, could lead to property 

damage from flooding.
If in all circumstances, it is absolutely not 

possible to direct the boiler overflow-outlet to 

3

Содержание 3001F

Страница 1: ...Auto Fill Catering Water Boiler With Integrated Multi Filter Installation And User Instructions INSTANTA LIMITED Canning Road Southport Merseyside PR9 7SN Tel 01704 501114 Fax 01704 501115 IB31 ISS 0...

Страница 2: ...wing Health Safety at Work Act IEE Regulations Local national Building Regulations BS Codes of practice Water Supply Regulations All personnel should be provided with sufficient training in the safe u...

Страница 3: ...ction point on the back of the boiler and the other end to the mains water supply via an accessible isolating tap with a BSP thread IMPORTANT If micro bore pipe is used instead of the inlet hose suppl...

Страница 4: ...st 15 minutes before starting to use Drain off approximately 10 litres of water to flush the new filter cartridge through The boiler is now ready for use Regular Daily Use Switch boiler on and wait fo...

Страница 5: ...e shape on the end of the new filter and push the two together until it clicks firmly in place 6 Remove protective cap from the top of the new cartridge and ensure the two rubber seals are in place 7...

Страница 6: ...hine off Press hold on off button for approximately 12 seconds until red screen shows PR in top right corner then release button Temperature setting is displayed Press hold button long push for approx...

Страница 7: ...amounts of cold water to ensure all traces of de scaler are removed before using the boiler again Replace evaporation plates tank lid and outer lid Draw off tap The draw off tap components are subjec...

Страница 8: ...as efficiently as possible please have the following information available Brief description of problem Product Type model Serial Number label on right hand side of machine This is essential Guarante...

Отзывы: