7
TREADMILL STRUCTURE
INSTALLATION SKETCH
Step 1:
Put meter on the meter tube.
a)
Use 2 pcs of Screw M8*20 with 2 pcs of washer to solid the meter tube. (Don’t fasten screw at first).
b)
Use 2 pcs of Screw M8*60 with 2 pcs of washer, 2 pcs of nut to solid the meter tube. (Don’t fasten
screw at first).
c)
Use 2 pcs of Screw M8*20 with 2 pcs of washer to solid the meter. (Don’t fasten screw at first).