
Page 13
Step 11: Start routing the left Lower Cable by screwing in the Cable Hex Bolt. Then loop the cable around
Pulley 5 of the left Floating Pulley Assembly and down through Pulley 7 on the Upright 1. Pass
through the Base Frame, up around Pulley 9 and finish routing the cable through the swivel
pulley and install the “U” Bracket Assembly.
Repeat for Lower Cable on other side with Pulley 6, Pulley 8, and Pulley 10.
Attach the Pulleys to the Base Frame using:
1 – M10 x 90 Hex Bolts
2 – M10 Flat Washers
1 – M10 Locknuts
1 - Spacer, 11 ID x 19 OD x 17 L
NOTES: Wrench Tighten Now
.
1 - M10 x 90 Hex Bolts
2 - M10 Flat Washers
1 - M10 Locknuts
1 - Spacer, 11ID x 19 OD x 17L
Step 11
“U” Bracket Assembly
Upright 1
Base Frame
Support Tube
Floating Pulley
Assembly
Pulley 6
Pulley 5
Pulley 9
Pulley 10
Pulley 8
Pulley 7
Pulley 5
Pulley 6
Cable Hex Bolt
Lower Cable p/n GM883-500-002
Cable lengths are in millimeters and for reference only.
Cable lengths could change at any time without notice.
Upper Cable p/n GM883-500-003
Guide Cable p/n GM883-500-001
DUAL LINE LAT/ROW CABLE CHART
Lower Cable
Swivel Pulley
Содержание Dual Lat/Row
Страница 7: ...ASSEMBLY INSTRUCTIONS Page 4...
Страница 25: ...877 738 1729 DECAL REFERENCE PAGE 22 8 870 718...
Страница 26: ...Page 23 DECAL REFERENCE...