
Page 9
Step 7: Pull the preinstalled cables through the Upright 1 and
down and around Pulley 1 and Pulley 2. Make sure that
the cables come down straight. Afterwards, connect
the Top Beam to the Upright 2 and the Upright 1 using: 4 – M10 x 25 Hex Bolts
2 – M10 x 125 Hex Bolts
12 – M10 Flat Washers
6 – M10 Locknuts
NOTE: Wrench tighten all hardware from Steps 1-7 excluding Step 2 now.
Step 7
4 - M10 x 25 Hex Bolts
2 - M10 x 125 Hex Bolts
12 - M10 Flat Washers
6 - M10 Locknuts
Upright 1
Upright 2
Top Beam
Pulley 1
Pulley 2
Содержание Dual Lat/Row
Страница 7: ...ASSEMBLY INSTRUCTIONS Page 4...
Страница 25: ...877 738 1729 DECAL REFERENCE PAGE 22 8 870 718...
Страница 26: ...Page 23 DECAL REFERENCE...